    <div class="moz-cite-prefix">Hi, <br>
      <br>
      I posted the notes from the last Hall D controls meeting on the
      wiki <br>
      and pasted them to bottom of this message. <br>
      <br>
      Hovanes. <br>
      <br>
      <h1><span class="mw-headline" id="Minutes">Minutes</span></h1>
      <p>Present: Dave, Mark S., Scot, Orlando, Hovanes, Elton, Nerses
      </p>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=4"
            title="Edit section: BCAL pulser">edit</a>]</span> <span
          class="mw-headline" id="BCAL_pulser"> BCAL pulser </span></h3>
      <ul>
        <li> Orlando showed <a
href="https://halldweb1.jlab.org/wiki/images/c/c6/BCALPulser_GUI_presentation.pdf"
            class="internal" title="BCALPulser GUI presentation.pdf">
            the status of the BCAL pulser control</a>.
        </li>
        <li> The application is pretty much ready to be used. </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=5"
            title="Edit section: Alarms for voltages">edit</a>]</span> <span
          class="mw-headline" id="Alarms_for_voltages"> Alarms for
          voltages </span></h3>
      <ul>
        <li> Nerses is working on the <a
href="https://halldweb1.jlab.org/wiki/index.php/Alarms_for_voltages_%28Nerses%29"
            title="Alarms for voltages (Nerses)"> scheme to generate
            alarms for voltages </a> in EPICS. </li>
        <li> He showed the logic he is currently considering. </li>
        <li> There was a suggestion to have an alarm when the voltages
          are set to be off, but they are still on, </li>
        <li> Orlando pointed out that there will be a delay between the
          moment the setpoint is set and setpoint is readback. This time
          delay needs to be taken into account.
        </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=6"
            title="Edit section: BCAL interlocks">edit</a>]</span> <span
          class="mw-headline" id="BCAL_interlocks"> BCAL interlocks </span></h3>
      <ul>
        <li> Dave reported significant <a
            href="https://halldweb1.jlab.org/wiki/images/9/96/BCAL_Interlock.pptx"
            class="internal" title="BCAL Interlock.pptx"> progress on
            the BCAL interlocks </a> . </li>
        <li> Upstream is wired and tested. Downstream interlock is in
          progress. </li>
        <li> Downstream chiller is not connected as of today. Will be
          connected most likely by the end of today. </li>
        <li> Buttons need to be change to match Elton's convention .
        </li>
        <li> Hovanes asked Elton if the expert GUI that Dave has will
          need to be copied to EPICS or EPICS will need to have only a
          GUI for the shift personnel with very limited personality.
          This was followed by a discussion about the need to have a PLC
          in the counting house. </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=7"
            title="Edit section: Radiator stage">edit</a>]</span> <span
          class="mw-headline" id="Radiator_stage"> Radiator stage </span></h3>
      <ul>
        <li> The test were done by Yi and Hovanes. The stage satisfied
          the specs. The limit switches will have to replaced. </li>
        <li> Slava and Hovanes handed the stage to Tim for installation
          on the tagger hall. The PS converter stage is in the FEL now.
        </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=8"
            title="Edit section: Cabling of the motors">edit</a>]</span>
        <span class="mw-headline" id="Cabling_of_the_motors"> Cabling of
          the motors </span></h3>
      <ul>
        <li> Tina has been working on the cables for the Hall D
          motorized stages. </li>
        <li> Collimator cable will be complete today. </li>
        <li> Scot needs the notation for the low and high limit switches
          for each stage. </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=9"
            title="Edit section: Gas system controls">edit</a>]</span> <span
          class="mw-headline" id="Gas_system_controls"> Gas system
          controls </span></h3>
      <ul>
        <li> Gas system is pretty close to be complete. </li>
        <li> Procedures are being circulated for the controls. </li>
        <li> Dave reported that 80% of the PLC GUIs are complete. </li>
        <li> Michael Staib from CMU is working on the EPICS controls
          screens for the gas system . </li>
      </ul>
      <h3><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=10"
            title="Edit section: Other">edit</a>]</span> <span
          class="mw-headline" id="Other"> Other </span></h3>
      <ul>
        <li> Elton would like to purchase flow meters with remote
          readout. He will send an e-mail with the data-sheet or the
          specification for the flow-meter he liked.
        </li>
      </ul>
      <h1><span class="editsection">[<a
href="https://halldweb1.jlab.org/wiki/index.php?title=Controls_Meeting_3-Apr-2014&amp;action=edit&amp;section=11"
            title="Edit section: Action items">edit</a>]</span> <span
          class="mw-headline" id="Action_items"> Action items </span></h1>
      <ul>
        <li> Hovanes will send info to Scot on limit switches for
          motors. </li>
        <li> Beni will forward Hovanes the draft of the procedures for
          the gas system to Hovanes. </li>
        <li> Dave will change the buttons on the BCAL temperature GUIs
          to match Hall D convention for controls buttons. </li>
        <li> Elton will send an e-mail with the information on the flow
          meter. </li>
        <li> Dave will check if the flow-meter that Elton wants could be
          easily integrated into the PLC controls. </li>
        <li> Orlando will commit the final version of the BCAL pulser
          control and Hovanes will check out the GUIs on the official
          tree.
        </li>
      </ul>