Hi All,
the vertical wire chambers 1, 3 and 5 have been connected with signal
cables and chamber 1 and 3 are already connected to the ADCs.
Chamber 5 will happen tomorrow.
We still have an issue with the LV system such that we cannot turn on
the second pair of +/- 5V. This means that he north side of chamber 3
could not be tested yet.
The fiber optics cable had to be disconnected from the crate
temporarily, to avoid accidental damage.
cheers,
Beni