[Halld-jlab] Hall D Staff Meeting Notes, Apr. 11, 2011

Mark M. Ito marki at jlab.org
Tue Apr 12 11:30:24 EDT 2011


Find the notes at 
http://www.jlab.org/Hall-D/software/wiki/index.php/Private:Hall_D_Staff_Meeting%2C_April_11%2C_2011 
and below as text.

   ==

Private:Hall D Staff Meeting, April 11, 2011

    Present: Eugene Chudakov (chair), Hovanes Egiyan, Mark Ito, David
    Lawrence, Lubomir Pentchev, Yi Qiang, Elton Smith, Sascha Somov, Simon
    Taylor, Tim Whitlatch, Elliott Wolin

Eugene

      * If budget agreement goes through on Thursday then in another week
        or ten days the Office of Science will know about the size of cuts.
      * This week there is a DIS conference at the lab, lots of talks from
        LHC, HERA, JLab,...
      * There will be a tour which includes Hall D on Wednesday
           + Tour guide crew: David, Elton, Yi, and Eugene
           + Thanks to David for updating posters
           + Two coils already in the hall


Mark

      * Some work on offline documentation
      * TOF: Trying to decide on overall geometry: size of counters
        arrangement of light guides
      * Start Counter: Latest tests with SiPM do not give adequate
        resolution
           + Will try new pre-amp with 4x4-cell array
           + Sascha and Valery Baturin testing time resolution with LED
             pulser
      * Target: Tim will start running the target meetings; more focus on
        mechanical design


Simon

      * Taking over strip gain calibration from Lubomir
      * Working on tracking errors, chi-squared distributions
           + Issue with pedestal noise for FDC strips fixed
      * Work on PID scheme continues (but on back-burner)


David

      * Looking at resolution in BCAL with course and fine segmentation
           + fine segmentation better than coarse, in energy and angular
             resolution


Lubomir

      * Four samples rigid flex, conductive tape, put in hall C, cannot be
        accessed easily
           + 10-100 kRad per ?
           + expect 100 Rad/year in Hall D
           + will go and get samples Wed., expect about 5 kRad
           + there is a monitor from Radcon in the Hall connected to EPICS
      * production of FDC
           + started, not as quickly as expected, as is to be expected
           + epoxy rather than clamps to apply rohacell[?]
           + one production cathode produced
      * Full-scale prototype turned vertically, gas started, iron source
        test planned
      * Room 126 looks empty now
           + Eugene: no surrender of real estate!


Hovanes

      * Starting this month, spending for online software has started,
        according to the schedule
           + looking at framework items in plan, especially display
             management
           + Accelerator uses EDM
           + CSS looks good, used at Oak Ridge, DESY
                o consists of a set of plug-ins
      * Ordered PC104 computer, will be used as embedded EPICS IOC
      * ROC CPU's will be delivered beginning of June


Sascha

      * Test of the SiPM's with Vitaly Baturin
           + 1 mm x 1 mm cell, 3 mm x 3 mm cell, and 4 x 4 cell array (of 3
             mm x 3 mm cells)
           + Amplitude decreases by factor of 4 from 10 kHz to 7 MHz,
             significant degradation at 500 kHz (the "halfway" point)
           + pixel recovery time looks too long, something like 10
             microseconds would explain effect
           + effect studied at various amplitudes, worse for higher
             amplitudes
           + 25 and 50 micron SiPM's have been ordered
           + Timing resolution, degraded by factor 1.5 to 1.6, from 240 to
             400 ps, at high rate
           + looked at array, behavior good, amplitude stable
      * Learning how to use run control for trigger test
           + time scale driven by wait for flashes, device drivers
      * Looking at tagger microscope prototype data taken in Hall B
           + there are a few bad channels
           + timing resolution reasonable, 300 ps
           + prototype was not calibrated


Elton

      * BCAL modules stacked up for machining, now finished
           + shipped modules 25-28
           + getting access to [23]Pansophy to keep track of modules
      * Concept for monitoring BCAL, based on design by Athens, with
        modifications.
           + Controller board feeds LED boards, pulse 10[?] at a time
           + small PR for 3 k$ to build 2 controllers and 80[?] LED boards
             will be submitted
           + MOU with Athens under-way
           + FCAL can use the same system
           + procedure for mounting on BCAL not finalized
           + Need to finalize light-guide design for the BCAL, attachment
             point of LED an issue here
      * Mechanical prototype for one wedge of cooling going to shop,
        expensive, need to look at design and simplify
           + Two electronic projects on same board
               1. amplifier summing board, schematics and layout done
               2. bias and temperature compensation scheme
      * Regina will build an extra module, they have enough fibers, will
        buy some additional lead


Yi

      * SiPM first-article test, 76 of 80 tested, at room temperature[?]
           + will repeat tests for a few
           + will irradiate some
           + these better by a factor of 3 in dark rate than previous
             samples, not known why
           + PDE 20% as expected
      * Production test planning thinking: can tiles be grouped to reduce
        number of channels? No.
           + Using 32 channel QVC (ADC) reading out individual cells
      * Production units arrive in August


Elliott

      * Online meeting Wed.
           + review tasks for online
      * Student from Yelena Prok to port [?]
      * Student from Dave Heddle and Yelena for event display
      * IRMES installation stuck in cyber security approval
      * UPS for counting house can be installed as early as Nov.
      * All phones will be VOIP
      * MYSQL configuration for online and offline will be discussed
      * Test stand for control system being assembled
      * Coil test: leak being worked on, bellows being fixed
           + Jonathan Creel: two weeks
      * VME-based DAQ system: need to build some things, will tap Chris
        Stanislav for protection box
      * Cody Dickover started on Danfysik PS task
      * Auxiliary test that everyone knows about
           + need software for VME boards
           + three week time-scale


Tim

      * Hall itself: stands for collimator due this week
      * Platform, Apr. 15, package goes out
      * Sample of new CDC straw tube, aluminized Mylar, production tube
        sent to Lamina, resistivity good, from [27]Sheldahl
      * Tagger bid, all paperwork is done, tying up procurement package,
        vendor chosen
      * Pair spectrometer, hope it gets here soon
           + basic test will be done at BNL

Retrieved from 
http://www.jlab.org/Hall-D/software/wiki/index.php/Private:Hall_D_Staff_Meeting%2C_April_11%2C_2011


More information about the Halld-jlab mailing list