[Halld-jlab] Hall D Staff Meeting Notes, December 5, 2011

Mark M. Ito marki at jlab.org
Mon Dec 5 19:10:58 EST 2011


Folks,

Find the notes at 
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_December_5,_2011 
and below as text.

   -- Mark
   _____

Private:Hall D Staff Meeting, December 5, 2011

    Present: Vladimir Berdnikov, Eugene Chudakov (chair), Nerses Gevorgyan,
    Mark Ito, David Lawrence, John Leckey, Bert Manzlak, Dmitry Romanov,
    Elton Smith, Sascha Somov, Simon Taylor, Ivan Tolstukhin, Tim
    Whitlatch, Elliott Wolin, Beni Zihlmann

Announcements, Eugene

      * current budget in place until Dec. 16, management not too worried
      * Dec. 8, Physics Holiday Party
      * Dec. 8, 8:30 am: strategic planning session
           + Eugene will present all things beyond the scope of 12 GeV
           + level 3 farm
           + Cerenkov
           + high-resolution FCAL
      * appraisals have been submitted, calibration meeting not yet held

Engineering, Tim

      * upstream platform installed
      * downstream designed, being reviewed
      * solenoid platform, basic design done, will be run by Cryo
      * tagger vacuum chambers statement of work done and signed off
           + cleaning and fab specification signed off
           + PR is next
      * target work continues with target group
      * mock up
           + almost together
           + with exoskeleton
           + by tomorrow or Wed.
           + will do cable handling exercise
      * BCAL modules expected Tue. or Wed.
      * Swiss cheese plate for CDC is in
           + polycarbonate
           + being checked with coordinate measuring machine
      * tagger magnet
           + steel is forged
           + in week or so, into the oven for annealing
           + then machining
           + materials for coils almost all there
           + brazing sample to be done
      * new COO for Hall D
           + not quite done yet
           + goes into effect with beneficial occupancy
      * photon beam has sagged 2 inches
           + in the middle, between tagger building and Hall D
      * schedule for working in tagger hall:
           + beneficial occupancy at same time as Hall D
           + electron beam dump installed late winter, early spring
           + beam line installed after tagger magnet arrives
           + Accelerator work to be finished before May down

Electronics, Eugene

      * big FADC-250 contract should be awarded tomorrow
      * FADC-125 schedule uncertain
           + hope that Gerard finalizes design by end of Dec., then go for
             procurement
      * discriminators close to being awarded
      * TDC's are supposed to be procured in FY13, may be pushed forward
      * trigger modules
           + procurement not started, but planning for it has
           + 100's of modules of each type
      * pre-amp testing has not started

Online, Eugene

      * bought network switches for DAQ
      * needs more manpower
      * Elliott: eliminating options, cutting down scope of study
      * coordination with DAQ
           + Elliott: Hall's opening has siphoned off some manpower
           + Sascha: read-out of fadc125 not done yet
           + Sascha: they have been helping us when we have problems

Safety, Bert

      * from Hovanes Egiyan, got the OSP for his DAQ control set-up in the
        EEL
      * new test set-ups need an OSP from now on

Test in Hall B, John, Sascha

      * alignment changes made when access allows
      * data being taken
      * alignment and gain balance work in progress
      * found a lot of features with boards
      * discussion with Hall B: integrate crate into Hall B read-out to get
        tagger information
      * might want to move to higher energy at holiday down
      * at 100 MeV for photons, 2.5 GeV primary electron beam

Offline, Mark

      * BCAL reconstruction being done
           + new segmentation
           + new algorithm
      * tracking changes on going
      * PID work on drift chamber dE/dx
      * on horizon: IT Review in May
      * potential improvement projects:
           + low-level reconstruction diagnostics
           + standard calculation of single-particle efficiencies
           + develop standard fiducial cuts

FDC Construction, Vladimir

      * working on checking FDC
      * three[?] cells assembled
      * at end of week first package done
      * constructed low-voltage map for first package
      * would like to continue this work, including assembling detector in
        the Hall

FDC testing, Beni

      * almost ready to get first package into test stand
      * enough channels to read out almost all of the wires
      * will look at global noise problems with large number of channels
      * setting up for more-than-one crate read-out for the spring

BCAL, Elton

      * test set-up: reworking boards, back at end of week
      * prototypes for BCAL readout board should go out for fabrication
        this week
      * tooling for light guide gluing being made
      * next week: readiness review at Santa Maria
           + data being taken
           + Yi: sees non-linearity in data
      * full wedge to be assembled without light guides soon
      * last modules plus baby BCAL in transit

Individual Reports

   David

      * online stuff mainly
      * planning documents
      * working with John to use FCAL beam test to develop software
           + interpreting FADC-250 data

   Dmitry

      * producing configuration database for Sascha
           + API, GUI, designed
           + specification needs to be written
      * CCDB
           + Python upgraded on ifarm
           + tests successful
           + install scripts written
      * wrote scripts to check use of CCDB in user code

   Nerses

      * finished with discriminator drivers for Linux
           + waiting for Sergey Boyarinov to implement in Hall B
           + working on documentation
      * planning organization of EPICS software
      * will work on HV control next

   Ivan

      * problems with flash ADC, at higher rates
      * finishing study of time resolution dependence on number of photo
        electrons

   Sascha

      * testing scalar implementation for flash, new firmware
      * working with Ivan on timing
      * working with Dmitry on database specification
      * beam-line activity:
           + have final drawings for pair spectrometer
           + Chuck has drawing for spectrometer detector
           + PCB design delayed, Fernando busy

   Beni

      * last week traveled to FSU, worked on TOF prototype
      * solved a lot of problems
      * number of photo-electrons from minimum ionizing particle about 450
      * they are running with non-optimal coupling from scintillator to
        phototube
      * signal very fast, both rise and fall, falls to 20% after 25 ns
      * needs to re-do current estimates for high-rate counters
      * not sure about 8-stage vs. 10-stage

   Mark

      * developed an Ubuntu build procedure
      * started discussions on SiPM placement for start counters
      * cleaned up nightly build errors/warnings
      * getting signatures for UMass MOU at JLab
      * Hall D wiki "private" feature fixed
      * FSU contract: final versions of SOW and scintillator specification
        signed, ready for PR
      * worked on CCDB testing with JANA

   Elton

      * spare solenoid
      * package almost ready to go to procurement
      * design/build contract
      * Eugene: new coil: dry, old coil: wet

   Elliott

      * working on documents
      * maintenance mod e-log for hardware started
      * database of manuals created
      * meeting on log books was held, all Halls
      * UPS coming on schedule
      * most of Cisco order here
      * CODA 3 in January perhaps
      * network in trailer?
      * online using mantis system
      * accelerator archiver, needs to be interfaced to css
      * looking to be using css for run control
      * quench detector going well
           + what we have will work
           + now understand problem that we had during the test
           + Floyd Martin's calculation good enough to understand range we
             need
      * sending Josh to AB school
      * tested new AB modules
      * controls meeting tomorrow for magnet safety/redundancy in controls
      * need to decide how to instrument full coil test

Retrieved from 
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_December_5,_2011