Hall D Staff Meeting, January 2, 2012
Present: Fernando Barbosa, Eugene Chudakov (chair), Cody Dickover,
Hovanes Egiyan, Nerses Gevorgyan, Mark Ito, David Lawrence, Lubomir
Pentchev, Elton Smith, Sascha Somov, Mark Stevens, Ivan Tolstukhin,
Announcements, Eugene
* the budget has arrived: 50 M$ for 12 GeV
* Lab imposing a hiring freeze
* "ETC" change request coming up: annual reworking of schedule, costs
(estimated time to completion)
* Friday: Hall D walk-through
* open house still scheduled for the 11th
* training for entrance to the Hall will likely change after
beneficial occupancy granted
David
* ramping up activity on online items
+ documents
+ software
Fernando
* contract for flash 250 awarded
+ will visit vendor next week: [27]ACDI
* contract awarded for discriminators, same company
* testing pre-amps next priority
Cody
* working on pre-amp testing
+ almost ready to go into production
+ interface in LabView being developed
+ can be used again for flash 250 testing
Fernando
* pre-amp testing: bottleneck installing brackets
* ETC
+ revisit f125 schedule
+ add pair spectrometer
+ add start counter
* HV modules, low voltage modules, cables starting to arrive
* Sascha: Chuck has received parts for pair spectrometer read-out
+ would like 20 channels of electronics
* for low voltage cabling need final measurements
+ Lubomir: three types of cables for cathodes, one type for the
anodes
* hired a new electronics technician, starting Jan. 16
* flash 125: plan is to go out for prototypes in two weeks
Mark S.
* power off in Hall right now
+ 480 V panel overheating
* recent activities with the solenoid
+ pumping on it, vacuum tests
+ hi-pot tests
Sascha
* summarized activities with Vardan on initialization of boards for
online in GlueX notes: comments welcome
* Vardan preparing templates for level 1 supervisor
* outlining SOW for UConn with Richard
* single contract: tagger detector and diamond radiator
Ivan
* finished all measurements on SiPM
+ will present at SiPM meeting this week
* planning to start with arrays after pre-amps are received
* Sasha: want to repeat measurements with laser
+ need some engineered safety controls
+ Fernando: safety documents also needed
* 25 micron devices will have worse timing resolution at low rate,
but less degradation at high rate than 50 micron
+ source of degradation not well understood
Elton
Readyness review for testing SiPM's at Santa Maria
* one student per test set-up, a couple of engineers
+ three stages:
1. inspection with microscope
2. measure rise-time, pulse length and pde
3. relative measurements of all properties
* in process of extracting final numbers from tests done so far
+ high-level parameters have not been extracted.
* three recommendations:
1. qualify system with SiPM's that JLab has already tested, for
all 30 units (through PDE system)
o put in large system, 32 at a time, look for relative
performance issues
o concern: cooling plate very thin, not flat, SiPM's do not
touch the plate,
2. put production manager in place
3. make sure documentation is up-to-date, put in actual
procedures
BCAL
* need to figure out how to glue light guides onto modules
* read-out boards are here, getting quotes on populating them
* will try to put something on the mini-BCAL
* first article pieces of light guides should be done end of this
month or early February
* mechanical parts, light guide fixtures are in
* monitoring system? something can be done, not sure how much of
final shipment will be done
SiPM shipments to Santa Maria
* got first shipment of 400
* supposed to get another 600 today
Spare solenoid
* PR submitted
* specification written
* hope to send out RFP mid-January
Mark I.
* TOF construction contract at Procurement
* TOF PMT decision next
* start counter: need SiPM read-out concept
* target: Chris Keith should be starting work soon
* software: nightly build broken due to changes in data model [added
in press: fixed now]
Lubomir
* before holidays, 5th cell on second package was added
* Anatoly was conditioning over the break
* tested new channels this morning, they look good
* not ready for 6th cell yet, but probably by end of week
* when pre-amps ready, will install on first package
+ 4×22 to finish 1st package
+ have 2×22
* cooling was discussed
+ can use cooling tubes for grounding
+ discussion of source of ground for detector will continue
offline
Hovanes
* alarm system for controls
+ getting familiar with various pieces
+ CSS
* ETC for online
+ purchases for computers will be delayed
+ main part will be pushed to 13
+ activities for DAQ software
o manpower thin
o may have to postpone some items
* need to start planning for counting house after we get it
+ Mark S. has started ordering items
* NIM electronics for online
+ need to order some
+ some NIM modules exist in F117
Nerses
* finished with discriminator planning, prototype software
* looking at scalar module, VME
+ made by Struck
+ has 64 kB FIFO
+ planned use: harp scans
+ discussion of VxWorks vs. Linux for the IOC will continue
offline