[Halld-jlab] Hall D Staff Meeting Notes, November 19, 2012

Mark M. Ito marki at jlab.org
Mon Nov 19 20:40:19 EST 2012


Find the notes below and at
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_November_19,_2012
___

Private:Hall D Staff Meeting, November 19, 2012

Present: Vladimir Berdnikov, Eugene Chudakov (chair), Hovanes Egiyan,
Mark Ito, David Lawrence, Kelly Mahoney, Bert Manzlak, Lubomir
Pentchev, Dmitry Romanov, Elton Smith, Sascha Somov, Simon Taylor, Ivan
Tolstukhin, Elliott Wolin

Eugene

Announcements

* Lehman review speakers: Elton, Jonathan Creel, Tim Whitlatch,
Eugene
* change request, i. e., ETC, to be done in March
+ there may be changes before then, but no definite plan for
them at present

Construction

* cool down duing the second half of December

• tagger magnet close to finished
*
+ Tim will visit vendor next week
+ will not be delivered before Jan.

Bert

* a Hall D, technician, working on cryo inserts, developed muscle
spasms in his back from working in a static position, a recordable
injury
+ if you find yourself in an unnatrual work position, think of
options: seating, equipment
+ Dr. Chandler may address this, industrial ergonomics, in a
talk
* another back injury occurred requiring first aid, not recordable
+ was correctly reported to Medical Services, do the same if it
happens to you

David

* working on reading in the raw data format
+ close to done

Lubomir

* moved 3rd package to EEL
* first package put on strongback
+ last week tested completely
+ will start with installation of cooling system
+ will be moved to 126 for testing
* EEL: will have 2 AC units installed, additional 20 kW capacity
* moved parts for fourth package to installation table
+ Vlad will test the week after thanksgiving
* for second package: have daughter cards, received 6 pairs of foils,
need workers
* tests in 126: efficiency and resolution is OK on strips,
+ found noise last week, coming from F1 TDCs, even with cables
disconnected
+ wire resolution measurement with three cathodes planes into
ADCs, can compare to wire time
o get about 200 microns in good part of the cell

Dmitry

* new CCDB tag announced: 0.05
+ installed on CUE machines
+ some new features added, including access control scheme
* trigger database: communication with Vardan for overall online
system
* ROOT-based event display: HDDS geometry can be used

Vladimir

* corrosion test # 3 running for several days now
+ when finished, with activation energy and temperature in Hall,
can estimate lifetime
+ will continue tests in Moscow

Ivan

* SiPM radiation tests
+ average dark rate increase 30 MHz after exposure in Hall B
+ average neutron dose 3 rem, 300 rem of EM dose
* fast controls, with Chuck and Sascha
* gluing fibers for pair spectrometer to tiles
+ will use optical epoxy

Sascha

* ready for contract award to UConn, small legal matter remains
* all documents submitted for Catholic, RFP issued soon
* hodoscope: working with Dan Sober on finalizing positions
+ played with magnetic field map, some issues with geant
tracking
* Hamamatsu confirmed: sending two PMTs at beginning of Dec., price
is now $500 per tube, 70$ for dividers
* Hamamatsu has confirmed delivery of 3mmx3mm SiPMs, will send Nov.
27, 270 pieces per month going forward
+ we will need to test them
* working on pair spectrometer: received fibers, tiles, glue,
thinking about wrapping
+ will go to Blue Crab and measure flatness of tiles
* trigger: working on initialization procedure with Vardan and
Dmitry, system will see state machine

Simon

* working on geometry
+ improvements to FDC geometry, some differences from as-built
+ CDC similar changes
+ reading geometry from XML
* working on understanding resolution from timing, started from drift
time and wire info, adding in strip information
+ need better understanding of time-to-distance relationship

Mark

* start counter PR submitted and signed
* work on several areas of data challenge
* TOF: FSU continues to test PMTs, 128 done so far
+ issue with quantum efficiency not resolved in FSU set-up

Elton

* IU contract extended to work on dark box
* extensions for BCAL
+ on hold: test setup, Danny will dismantle in April
* mechanical parts for BCAL ordered from manufacturer
+ will get enough for two boards, can go on to second board when
first-article approval of first is done
* SiPMs are in customs in Chile except for last 10 extra ones
+ can now assign to bins and produce jumper boards

Elliott

* 4x16 core box installed in counting house
* infiniband switch received, Dave Abbott will set that up
* configuration of box is underway
+ DAQ software installed
+ will inject events into ET ring, send to online monitoring
programs
* controls, review for cryo operations held
* Patrizia Rossi scheduling review for power, early January
* setting up databases for archiving for Josh
* last week had seminar from Labview, using EPICS
+ NI putting effort into it
* programs for solenoid controls written, ready go
* connections checked at chimney
* Eugene on online tasks: lots of them, as groups finish with
detectors they can turn to online issues

Hovanes

* working on ETC, rearranging labor and money for FY 13 and 14
* need to procure computers, disks
+ meeting with Computer Center, they will write specs for us
+ met with dave Abbott on purchase of infiniband hardware
* UPS is turned on, network is using it, three subnets up and running
* working on Python scripts to convert PLC programs to EPICS database
* Beni thinking about HV GUIs, will use CSS

Kelly

* talk on Personnel Safety Systems Integrity Management. See his
slides [39]here.

Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_November_19,_2012"

References

39. 
https://halldweb1.jlab.org/talks/2012-4Q/PSS%20Config%20Control%20-%20Hall%20D.pdf

-- 
Mark M. Ito
Jefferson Lab
marki at jlab.org
(757)269-5295