[Halld-jlab] Hall D Staff Meeting Notes, November 4, 2013

Mark Ito marki at jlab.org
Mon Nov 4 19:17:54 EST 2013


Folks,

Find the notes below and at 
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_November_4,_2013 
.

   -- Mark
_____________________________________

Private:Hall D Staff Meeting, November 4, 2013

    Present: Vladimir Berdnikov, Eugene Chudakov (chair), Mark Dalton,
    Hovanes Egiyan, Nerses Gevorgyan, Mark Ito, Vanik Kakoyan, David
    Lawrence, Lubomir Pentchev, Sergey Pozdniakov, Yi Qiang, Carlos
    Salgado, Sascha Somov, Elton Smith, Simon Taylor, Ivan Tolstukhin, Tim
    Whitlatch, Elliott Wolin, Beni Zihlmann

Eugene

      * status of possible promotions uncertain, will know more in January
      * safety issue and possible delay of commissioning
           + incident with U-tube, cryo group
           + safety being reviewed
           + Mont send email alerting us to possible delay in schedule
      * budget has arrived for Physics
           + enough for 1 month, maybe 2
           + larger than pure CR amount
           + only mission critical travel allowed still
      * accelerator readiness review
           + will likely implement single-pass beam first
           + Elton has initial commissioning plan in place
                o will be reviewed by small group
                o then presentation to beamline working group
                o then to the collaboration as a whole
           + initial accelerator plan is 2 nA to tagger hall, with
             emittance five times worse than spec
      * PAC41
           + original plan was re-prioritization only
           + by popular demand, new proposals will be entertained
           + prioritization will be addressed by a later exercise of some
             sort
                o Hall leaders and spokespersons will have to generate a
                  short form summary of approved program
                o includes consideration of compatibility with other
                  experiments
           + big projects will have particular difficulty because of budget
             environment
      * Amtec having problems with F125 and CTP production
           + one quarter to one third of the boards are not fixable
           + Fernando and others in phone conference with the company
           + soldering issues with the FPGAs
           + problems appear in batches
      * regular charging to the 12 GeV accounts can resume for this month

Beni

      * the CDC is here
           + on gas several days
           + signals seen
           + 50 mV peak-to-peak noise
           + gas pressure at 1/2 inch of water
           + one of six lines feeding input from upstream to downstream
             being used to monitor pressure at downstream gas volume

David

      * work on preparations for software review
           + manpower survey shows increase of factor of two over estimate
             from mid-2012, was 23 FTE-years, now 45 FTE-years, integrated
             over three years
           + added manpower from Northwestern, Regina, FSU, CMU
           + planned activities has additions as well: Geant4, analysis of
             reconstructed data, quality assurance contributions

Hovanes

      * counting house
           + new machines have arrived, Paul Letta configuring them
           + transitioning old functions to new hardware: level 3 farm,
             raid
      * radiator foils
           + reviewed Hall B inventory with Steve Christo
           + they are thin in the items we want; may have to order our own
           + they used Al for 10^{-5}, Au for 10^{-4}, Pt for 10^{-3}
           + Al has crinkles, Youri Sharabian has method for straightening
             them
           + Goodfellow: company that can provide foils in the shape we
             want
           + Sascha: want to use pair spectrometer for absolute luminosity
             measurement
           + will need radiator by April
      * want to start cabling collimator stage
           + need power to racks under platform
      * measured length of cables for profiler
           + need HV, LV, signal cables
           + need to calibrate with a source
      * obtained 20 PMTs from Hall A for halo counters, need 11
           + 3 in tagger hall, 4 in collimator cave, 4 in hall
           + need to build enclosure, mounting bracket, provide HV control
      * reviewing plan for UPS in tagger hall
           + for motor controllers and network switches
           + gives ability to retract in-beam devices soon after power out

Tim

      * tagger hall electronics rack location
           + previous location near vacuum box flange, relatively high
             radiation area
           + will try to get short racks and put them under magnet instead
           + for microscope and hodoscope
      * target
           + test two weeks ago with liquid Ne; looked good
           + can get away with less H2 than originally planned, tank can be
             in the hall
      * start counter parts in for constructing support structure
      * chilled water system installation underway, leak checking in
        progress
      * N2 system designed, parts are in hand
      * air system, design nearly complete
      * cooling for CDC being readied
      * tagger magnet mapping
           + system operational as far as motion
           + switch problem did not flip magnet over
      * hodoscope support plates in, being fiducialized by survey and
        alignment
      * FDC inserted in BCAL
           + working on system to measure location of all 4 packages while
             inside the BCAL
           + Bill and Yi looking at laser system used in solenoid mapping
      * TOF: first half of modules on the way here from FSU
           + will unload Wed. morning
      * racks in hall: 2 more to go
      * cable trays 90% done
      * pair spectrometer mapping fixture our for fabrication
      * big gas panel for CDC, FDC installed, most of stuff in gas shed
        installed
           + gas system ready in month or two
      * AC power: getting help from electricians
           + outlets for FCAL due on Fri.
      * insertion devices for beamline devices sent back to manufacturer,
        fabrication issues
      * pair converter: insertions sticks, foil holder came in
      * tagger mapping should start next week

Mark D.

      * installing CODA in the hdops account, in preparation for FCAL
        testing
      * preparing for online data challenge
           + will take data from front-end electronics all the way to tape
             library

Simon

      * continuing work on alignment with straight tracks
      * looking at the 5% crash rate with reconstruction jobs

Mark I.

      * preparations for software review
           + review documents
           + provided timeline to Graham for CPU needs
      * new release of sim-recon ready to go
      * converted our Subversion repository to git and uploaded to the
        GitHub site as a test

Sascha

      * Ivan looked at cosmics with fine-grain tiles, measured light
        collection
           + expect 50-60 p. e. per hit
           + all tiles arrived beginning of Sep.
           + will proceed with fabrication in a week or two
           + final drawings were produced by Chuck last week
      * diamond procurement
           + UConn wants us to proceed with Element 6
           + also in contact with Cornell guy who dealt with E6
      * trigger stuff
           + Sergey P. has developed configuration files, same as Hall B
           + waiting on feedback from Ben Raydo on GTP algorithm
           + hardware installed in hall for FCAL testing
      * trigger monitors for F250
           + need monitors for each trigger subsystem
           + based on scalars
      * Elton: has there been discussion on data format for F250 like that
        for F125?

Sergey

      * has generic configuration files
      * completed preparations for FCAL read-out

Elton

      * looking at commissioning beamline
           + schedule beam for to tagger for 2 weeks in April depends on
             box power supplies for arcs and Hall D line coming in ahead of
             schedule
           + this is a level 3 milestone for the project
           + accelerator will install a dumplet at end of north linac
           + beam from lower passes to Hall D possible, but not likely
      * Accelerator Readiness Review (ARR) process will discuss tagger hall
        in Jan.
           + planning discussion this Wed.
           + PSS ties tagger and Hall D together
           + to access Hall with beam in tagger hall requires
             reconfiguration, review
           + physical shielding needs to added in tagger hall
           + full document calls out plans for pair spectrometer, active
             collimator, profiler, etc.
      * BCAL
           + no chilled water yet
           + monitoring waiting for cabling
                o 4 patch panels not build yet
                     # bias voltage system
                     # distribution boards for monitoring
                     # pieces in, not put together yet
      * FCAL
           + monitoring panes received from Eljen
           + sanded, will be put up today
           + then LEDs attached to sides, cabled up

Lubomir

      * FDC: long discussion on survey plan
           + FDC not a rigid body
           + Bill will modify optical targets to allow z-position
             measurement
                o use reflective tape, as Yi did for solenoid mapping
           + will cross check with Survey
           + after survey, on to cabling
      * mesh for attaching cables yet to be installed
           + will run cooling system, check for leaks, before cable
             installation so there is room to work in case leaks found
      * working on alignment and calibration with full electronics test
        data (cosmics_
           + resolutions obtained by excluding one cell out of six
           + getting 300-350 microns for both strips and wires
           + indicates mis-alignment
                o formulating reasonable set of parameters that need
                  calibration
                     # must choose among a large list of degrees of freedom
                     # some parameters well known; will not need adjustment
           + see better results when looking at just a small part of the
             chamber

Carlos

      * working on PWA code w/ theorists and Hall B people
           + implementing improvements to isobar model
           + in particular 3-body amplitudes in eta to 3 pi
           + Adam S. and his post-docs providing framework for specifying
             amplitudes
           + putting technique into Hall D framework, working with Yi on
             this
      * continuing work on baryon contamination problem
           + theorists are debating best approach: model or data

    Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_November_4,_2013"

-- 
Mark M. Ito, Jefferson Lab, (757)269-5295, marki at jlab.org