[Halld-jlab] Hall D Staff Meeting Notes, November 18, 2013

Mark Ito marki at jlab.org
Thu Nov 21 13:00:05 EST 2013


Folks,

Find the notes below and at 
https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_November_18,_2013 
.

   -- Mark
_________________________________________

Private:Hall D Staff Meeting, November 18, 2013

    Present: Vladimir Berdnikov, Mark Dalton, Hovanes Egiyan, Mark Ito,
    Vanik Kakoyan, David Lawrence, Lubomir Pentchev, Sergey Pozdniakov,
    Dmitry Romanov, Elton Smith (chair), Sascha Somov, Simon Taylor, Ivan
    Tolstukhin, Tim Whitlatch, Elliott Wolin, Glenn Young, Beni Zihlmann

Sascha

      * multiple problems with the DAQ, Bryan Moffit and Dave Abbott
        working them
           + problems with multi-casting
      * managed to boot FCAL crate and read it out, took 2 days
      * next: 6 crate configuration
      * need to calibrate sub-detectors: pedestals, timing offsets, etc.
      * working on a stand-alone system to calibrate sub-detectors
      * modified FADC format, Sergey has new version of configuration file
      * CODA 3 is running
      * firmware for flash and TI boards have been upgraded
      * code developed in /gluex/devel directory
           + there is code from Beni for stand-alone special purpose tests
      * online group also has a version of CODA
      * Elliott: online data challenge
           + try level 3 in December perhaps
           + in playback mode
           + there will be need to share system
           + plan to go from crate to tape library via level 3 farm
           + exercise farm manager
           + exercise multiple stage event building
           + test the new machines
      * How is busy propagated in the system; is there a plan?
      * Elliott: gluon ROC dev, identical to ROC environment

Tim

      * FCAL power is up
      * BCAL power: south side is done
      * N2 system: installation starting
           + will take weeks to 1.5 months
      * air system installation over next month or two
      * cooling for BCAL, CDC being designed
      * cable trays all installed, save one small section
      * starting BCAL and FDC cooling hook-ups
      * Lubomir, Beni: power needed to FDC racks
           + cannot mix FADCs and TDCs

David

      * produced a new offline build system
      * working on a new JANA release
      * translation tables still have to go into CCDB
      * Elliott: translation database table may be unified with other
        online databases
      * Request from Elliott a list of top goals for the next online data
        challenge

Beni

      * working on CDC and FDC testing, developing code to run on the ROCs
      * getting the gas system running
           + providing information to Dave Butler for his programming
      * all major components of gas system have been installed
           + many gas lines and cables for controls need to be connected
             still
           + operational by January

Hovanes

      * Nerses has left
      * Need to install FDC voltage control, move to production directory
           + power not there for testing
           + there are some bugs in checked in version
           + test before connecting to detector
      * working on EPICS software for microscope and FCAL
           + FCAL prototype exists, real stuff requires some modifications
             to scale
           + microscope: don't have hardware from UConn, do have an API
           + We do the EPICS side, UConn will do the ethernet
             communications
           + purchased an embedded computer, setting it up
      * bought LV and HV boards for beam profile monitor
           + Fernando looking at providing cables
      * Paul Letta is installing new computers, need to transition from old
        borrowed nodes, target do this by end of this week
           + some mount points broken, some compiled code may not work
             anymore
      * SNMP protocol does not work on new machine, worked on gluon1,
        communication very slow

Vladimir

      * finished Garfield simulation for cluster counting
           + estimated separation between pi's and K's
           + presented at PID upgrade meeting
      * will play w/ gas mixture to get better Lorentz factor to lessen
        space charge effect

Ivan

      * last week finished installation and check for one PS arm
      * doing final tests: uniformity of signals, temperature stability
      * Fernando checked signals with LED
      * mounting structure should be here this week
      * second arm not populated with SiPMs, Fernando wants to review
        results from first arm
      * one week for electronics, two weeks for splitter

Mark I.

      * working on preparations for the software review next week, writing
        talk, reviewing documents

Simon

      * working on alignment with straight line tracks
           + have working system for CDC
           + will present at calibration meeting this week
      * found problem that is causing events to hang, extrapolation of
        trajectory never ends for some tracks at 90 degrees
           + bomb proofed to avoid hangs
           + next: understand cause of problem

Lubomir

      * FDC being surveyed for third time
           + new reflectors installed to facilitate measurement z-position
             of packages
           + want accuracy of several hundred microns
      * want to check leaks before cabling
           + do not have the mesh yet
      * Vladimir leaving in 2 weeks
      * Using cosmic data to look at resolution
           + using internal hits: 350 microns
           + using external tracking, i. e., IU chambers, get better than
             200 microns in good part of cell (including resolution of IU
             chambers)
      * hard to align planes and calibrations with cosmics, not enough
        statistics
           + will need beam
           + prefer tracks parallel to beamline, may use pair spectrometer
             converter as a target

Vanik

      * improving speed of GUIs
           + found status updating slow
           + many invocations of a Python scrips
           + improved speed factor of 4 to 5
      * GUIs ready to test with FCAL

Yi

      * goniometer test data analyzed
           + satisfies spec
           + repeatability better than 1 millidegree
      * PID upgrade, read-out options
           + Incom meeting, getting info from early adopters
           + they have had success with fabricating photocathode[?]
      * Babar quartz
           + several groups competing: JLab, LHCB, Panda, ePhenix

Mark D.

      * working with CODA group, testing the system components

Elliott

      * great progress on the farm component
      * last week, firmware for FADC 250: minor problem being fixed
      * David and Carl, bug involving network switches
      * telecom fibers turned over to Facilities
      * network being provided as needed
      * working on code management, directory structure, build system
      * controls: Dave Butler making great progress
           + FCAL tested
           + met on gas system
      * inventory database system, talking to detector groups about what
        should be put in

Glenn

      * project in magnet review for next two weeks
           + Hall D magnet may be included
      * Lehman review: January
           + talk from Dana on cryo requested
           + run through[?] on Dec. 9 in Washington
      * beam expected on Dec. 2
           + some issues with beam transport
      * Director's magnet review Dec. 10, 11
      * EVMS review, variances examined, before Thanksgiving
      * still on CR, cash is tight
      * Hall D needs to close books by Oct. 2014

    Retrieved from