[Halld-jlab] Hall D Staff Meeting Notes, September 21, 2015

Mark Ito marki at jlab.org
Tue Sep 22 16:28:05 EDT 2015


Friends,

Find the notes below and at 
https://halldweb.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_September_21,_2015 
.

   -- Mark
   _______________________


  Private:Hall D Staff Meeting, September 21, 2015

 From GlueXWiki

Present: Eugene Chudakov (chair), Mark Dalton, Alexandre Deur, Hovanes 
Egiyan, Sergey Furletov, Mark Ito, David Lawrence, Lubomir Pentchev, 
Elton Smith, Justin Stevens, Simon Taylor, Beni Zihlmann


    Eugene

  * Hadron Conference was here last week
      o not clear how to distinguish particles from threshold effects
      o perhaps observe multiplets
      o Stefan Powell: perhaps answer will emerge in analogy to atomic
        spectral lines
  * budget: it's the end of the FY and we spent everything
  * running in 2015
      o Rolf: no provision for running
      o plan: electron beam to tagger dump
      o fast feedback testing will require photons, so plan may have to
        be amended
      o schedule has shrunk from 9 weeks to 5 weeks of running
      o 12 GeV is top priority, DOE mandated
      o January run still planned, for physics
      o in December, will go to Hall A dump as well
      o helium treatment of cavities far behind schedule
      o options for additional goals:
          + Hall D photon beam
          + high power to Hall A
  * solenoid
      o magnet still at 0 C
          + resistance is 13.6 Ohms, not 16 Ohms expected at room
            temperature
      o all coils at the same temp.
      o water sensor shows no anomalies
      o last weekend, George Biallas increase current on heater, saw a
        10 degree rise
      o work on mock-ups for changes going well, procedures tested,
        practice welds done, scheme for attaching Teflon pipe to
        stainless pipe worked out
      o after opening:
          + use boroscope to find out where the two pipes go
          + when 2 inch helium pipe opened, process irreversible, gasket
            cannot be re-used or replaced


    David

  * Working on event tagging
      o mandated from software review
      o mark events suitable for use in calibration


    Sergey

  * debugging hardware: start with F125s for FDC
      o works on bench for Cody, problem in real crates for compression
        + multi-block read-out
  * CODA bug was fixed


    Simon

  * working on sag of CDC straws
      o Spring run: 2 connectors worth of channels where fit does not
        work, fixing these up
  * did survey of multi-photon final states


    Beni

  * two knocking sensors purchased
      o hooked up to sound card on PC
      o connected to ADC, good signal to noise
      o will add 60 Hz canceling


    Alexandre

  * finishing analysis of beam data
      o will write summary note, send to Todd Satogata
  * ordered sensors for fast access to Hall D
  * item ordered in Spring still not here
      o need 2 neutron and 2 photon detectors to replace loan from RadCon


    Mark

  * started conversion of data challenge 3 to SWIF
  * first draft of scripts to run simulation for Spring Commissioning II
  * working with Sean on automatic builds of pull requests
  * features added to build_scripts, documented in recent GlueX note
  * hdgeant now runs on RHEL7. Changed compiler flags for GCC 4.8


    Justin

  * DIRC review 3 weeks from Wed.
  * Technical Design Report
      o give collaboration 1 week to feedback
      o give to committee 1 week in advance
  * work also on Budget and Management Plan
  * some progress on Spring data fits


    Lubomir

  * working on diagnostic software
      o monitor efficiencies
  * rate estimate:
      o at 10 nA, 10^-4 radiator, near aging limit in 3 weeks with an
        organic gas component, which we do not have
      o ratio of current on inner wires field-off vs. field-on is about 40
      o concludes we do not want to run with HV on and field off
  * tests done with mass flow controllers
      o weird behavior
      o doubling setting does not double flow
  * might be something wrong with the gas
      o using spare package with more charge collected, see factor of 2
        between Garfield prediction and data


    Mark

  * working on low-level BCAL calibration
      o attenuation lengths, gain factors
      o possible problem with late time hits generated by firmware
  * looking at simulation: photon reconstruction


    Hovanes

  * LED pulser for FCAL
      o CAEN 1495 board
      o high level software re-designed, now operational
      o now pair spectrometer wants one
          + forked another application, hardware connected in Hall
  * VME board for RF pre-scaling
      o installed in tagger hall
      o using spare for developing EPICS application
      o sets pre-scale factor and duty factor
      o basic GUIs in place, user GUI to come


    Elton

  * muon decays in the BCAL
      o see correct lifetime in 2 microsecond window
      o peak energy of electrons 1/2 of expectation using nominal
        calibration
      o looked at mode 8 data: problems there
      o Will McG. looked at mode 7 data, sees same factor of 2
      o shape of spectrum wrong, looks like a peak produced by a
        low-energy threshold
  * Tegan B. showed significant eta peak
      o exclusive events, measured recoil proton and missing mass cuts,
        6 GeV data
  * last week nitrogen flow changed and humidity went up
      o due to nitrogen diverted to solenoid
      o will want to monitor this
  * FCAL turned on, several failed bases
      o some voltages drop during day
      o firmware upgraded but going back to old firmware did not fix things
      o problem seen after installation of EPICS controls, but removing
        them did not fix things
  * stand-alone FCAL DAQ not working
  * read-out values seem wrong for short periods, e. g., nominal 1500
    gives 1650 V
  * taking problem bases out and shipping to IU for test and repair
      o concern that bases going bad


    Cryotarget

Alexandre asked if we want to run it in December. Depends a lot on how 
hard it is for the target group to get it running.

Retrieved from 
"https://halldweb.jlab.org/wiki/index.php?title=Private:Hall_D_Staff_Meeting,_September_21,_2015&oldid=70264"

  * This page was last modified on 22 September 2015, at 16:20.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20150922/fc2683f9/attachment.html>


More information about the Halld-jlab mailing list