  Hall D Staff Meeting, January 23, 2017

 From Gluex PRIVATE Wiki

Present: Alexander Austregesilo, Thomas Britton, Eugene Chudakov 
(chair), Mark Dalton, Hovanes Egiyan, Sergey Furletov, Mark Ito, David 
Lawrence, Paul Mattione, Lubomir Pentchev, Patrizia Rossi, Sascha Somov, 
Elton Smith, Simon Taylor, Beni Zihlmann


    Contents

  * 1 Eugene
    <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Eugene>
  * 2 Run Preparations
    <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Run_Preparations>

      o 2.1 Solenoid
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Solenoid>
      o 2.2 tracking chambers
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#tracking_chambers>
      o 2.3 BCAL, Mark D.
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#BCAL.2C_Mark_D.>
      o 2.4 FCAL, Sascha
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#FCAL.2C_Sascha>
      o 2.5 Trigger, Sascha
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Trigger.2C_Sascha>
      o 2.6 Online, Sergey
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Online.2C_Sergey>
      o 2.7 TOF, Beni
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#TOF.2C_Beni>
      o 2.8 Slow Controls, Hovanes
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Slow_Controls.2C_Hovanes>
      o 2.9 Schedule, Beni
        <https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&printable=yes#Schedule.2C_Beni>


    Eugene

  * Tomorrow the new lab directory will tour the lab. Hall D is on the
    tour schedule.
  * Budget scenarios
      o OK -> continuing resolution and 3% increase starting in FY18, 23
        weeks of running
      o good -> 3% in FY17 at some point
  * July: S&T review


    Run Preparations


      Solenoid

  * conductive hoses replaced, will get power supply help from
    engineering division
  * issue with ground fault detector is in the power supply, not the magnet


      tracking chambers

  * Beni: CDC on
  * Lubomir: FDC on


      BCAL, Mark D.

  * standalone DAQ problem now fixed
  * resolution for pi0s not converging, firmware and # of samples is
    different


      FCAL, Sascha

  * Adesh reports FCAL resolution worse as well
  * FADC emulation working pretty well


      Trigger, Sascha

  * ROC FCAL10 working, problem found
  * F1 TDC initialization problem isolated, solution being worked on
  * FADC in TOF crate: received report of bad module from Beni
  * Cosmics planned for Wed., will talk to Sean about exercising emulation


      Online, Sergey

  * new hardware controller for RAID, gives 1.5 GB/s
  * could reconfigure network, but bottleneck is in the RAID, won't be
    done now
  * moving from RAID 6 to RAID 5, three partitions
  * will not switch CODA version this run


      TOF, Beni

  * TOF voltage values ready for all double-ended counters
  * Brad obtaining voltages in parallel
  * new calibration constants and performance tests for lower voltage in
    progress


      Slow Controls, Hovanes

  * goniometer still working
      o preparing jumpers for use if problem with limit switch
        encountered, avoids damage to motors
  * discussed new 45 degree PARA and PERP with Ken Livingston
      o will implement as a separate diamond in the control software
      o each setting will need dedicated scan
      o will use the short-cut alignment procedure this time


      Schedule, Beni

  * they start tuning machine Wed. afternoon
  * hope for progress at rate of one arc per shift
  * beam due in Hall D Mon. afternoon if nothing goes wrong
  * Hall B KPP program: Feb. 3-18
  * Hall D will close on Friday

Retrieved from 
"https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_January_23,_2017&oldid=1836" 


  * This page was last modified on 25 January 2017, at 17:00.
  * This page has been accessed once.


-- 
marki at jlab.org, (757)269-5295

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20170125/78ce8627/attachment.html>


More information about the Halld-jlab mailing list