  Hall D Staff Meeting, November 13, 2017

Present: Alex Austregesilo, Thomas Britton, Eugene Chudakov (chair), 
Mark Dalton, Alexandre Deur, Hovanes Egiyan, Sergey Furletov, Mark Ito, 
David Lawrence, Paul Mattione, Lubomir Pentchev, Elton Smith, Sascha 
Somov, Simon Taylor, Tim Whitlatch


    Announcements

  * Eugene showed some pictures of the DIRC in the Hall.
  * The appraisal cycle is in progress.


    Preparations for the Run

  * Tim:
      o solenoid
          + mass flow controller tested
          + liquid sensor refurbished, will be swapped in
      o will move platform by end of week for muon chamber
  * David:
      o will run cosmics overnight, turn on monitoring systems
      o AMD computer has bad Ethernet, even after coming back from repair
          + may get retired to the online farm
      o run period changed over to "2018-01"
  * Sergey:
      o will run CODA 3.07
      o doing high luminosity preparation with new gluonraid 4, 2
        network interfaces
  * Alex: starting "incoming" processing launches
  * Sascha:
      o one FADC bad in tagger crate, now fixed
      o tagger hodoscope powered
      o next: go through sub-detectors one-by-one
  * Mark I.: JLab shifts will be assigned next week after domestic swap
    period concludes
  * Paul: will be helping with diamond alignment again this run
  * Mark D.: FCAL will get new voltages
  * Hovanes:
      o all Dell computes were restarted last week
          + if any IOCs are missing, let him know
      o working on gamma profiler read-out upgrade with Ben Raydo
      o V-wire control needs further development
  * Alexandre: we still have one empty run coordinator schedule slot
  * Lubomir: hardware interlock for FDC low-voltage chiller complaining
  * Elton: we need to start working on HCO for the Hall


    Data Processing

  * Paul: almost ready to start reconstruction pass.
      o tagger timing needed calibration over weekend by Sean Dobbs
          + Alex is doing a monitoring launch to look at results
      o goal is to launch by tomorrow morning
  * Simon: working on track matching to BCAL
      o found and fixed an issue with start counter matching
      o deterioration of matching efficiency with BCAL material added
        not understood
      o launch will proceed without new matching code and an air BCAL

-- 
Mark Ito, marki at jlab.org, (757)269-5295

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20171114/b1d150ff/attachment.html>


More information about the Halld-jlab mailing list