Hall D Staff Meeting, March 8, 2021
Present: Alexander Austregesilo, Eugene Chudakov (chair), Mark Dalton,
Alexandre Deur, Hovanes Egiyan, Sergey Furletov, Mark Ito, Igal Jaegle,
Keigo Mizutani, Lubomir Pentchev, Patrizia Rossi, Sascha Somov, Simon
Taylor, Tim Whitlatch, Beni Zihlmann
Announcements, Eugene
* Letters of Increase went out
* Accelerator status: CHL 2K cold box on schedule
* Upgraded Injector Test Facility (UITF) beam test on HDIce target
o results disappointing
o request submitted for another week of tests to understand
obstacles to heat removal
* Lattice calculation of gluex distribution announced by Jianwei Qiu
* People need to make a plan to complete their property validation
* All-Hands meeting announced for Thursday a 3 pm
* Lab was expecting guidance from DOE on Medcon levels, no news yet
* Patrizia: SOLID CD0 review started today
Work in the Hall, Tim
* Moved platform three times today
o Survey and Alignment were in the Hall
o position repeatable to 300 μm
o move was in a southerly direction by 4 mm
* TOF was surveyed at 4 mm too high
o Beni sees the hole 5 mm too low in data
* Other plans for the week:
o there is an issue with the vacuum valve control signals (the
valves themselves are fine)
o replacing cold cathode for insulating vacuum for coil 3
o BDX tent will be cleaned
o nothing to be done on the DIRC by the technical staff
o there is a leak in air system for cycling vacuum valves
+ some leaks fixed
+ compressor was running continuously
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-jlab/attachments/20210308/4f067c94/attachment.html>
More information about the Halld-jlab
mailing list