    People,<br>
    <br>
    Find the notes below and at
<a class="moz-txt-link-freetext" href="https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_January_26,_2015">https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_January_26,_2015</a>
    .<br>
    <br>
      -- Mark<br>
    __________________________________________________<br>
    <div id="globalWrapper">
      <div id="column-content">
        <div id="content"> <br>
          Private:Hall D Staff Meeting, January 26, 2015<br>
          <div id="bodyContent"> <br>
            Present: Present: Fernando Barbosa, Eugene Chudakov (chair),
            Mark Dalton, Alexandre Deur, Hovanes Egiyan, Sergey
            Furletov, Mark Ito, Bert Manzlak, Paul Mattione, Sergey
            Pozdniakov, Sascha Somov, Simon Taylor, Beni Zihlmann
            <br>
            <span class="mw-headline" id="Announcements.2C_Eugene"><br>
              Announcements, Eugene</span><br>
            <ul>
              <li> Timesheets from last October require review due to
                hours moved from ops to 12 GeV. Please respond to
                notifications.
              </li>
              <li> conference travel
                <ul>
                  <li> last year: invited talks only
                  </li>
                  <li> if interested in giving invited or contributed,
                    see Eugene
                  </li>
                  <li> there is an accelerator conference coming up in
                    Richmond, if interested let Eugene know
                  </li>
                </ul>
              </li>
              <li> budget
                <ul>
                  <li> more info at Feb. 3 DOE briefing
                  </li>
                  <li> Fall run: 6 weeks with 25% uptime, a revised
                    schedule coming soon
                  </li>
                </ul>
              </li>
              <li> taking over Yi's former responsibilities
                <ul>
                  <li> solenoid controls: Beni
                  </li>
                  <li> PDL: Beni
                  </li>
                  <li> PWA work with Carlos: Paul and Justin should
                    attend meetings, Simon and Mark should continue to
                    do so
                  </li>
                  <li> DIRC:
                    <ul>
                      <li> new photo-detectors from Argonne a
                        prospective project
                      </li>
                      <li> Justin can work on Hall B solution
                      </li>
                    </ul>
                  </li>
                </ul>
              </li>
              <li> preparations for run
                <ul>
                  <li> liquid hydrogen target
                    <ul>
                      <li> hazard analysis from Tim
                      </li>
                      <li> target group will operate target
                      </li>
                    </ul>
                  </li>
                  <li> goniometer hazard analysis needed
                    <ul>
                      <li> diamond heating
                      </li>
                      <li> high beam current protection
                      </li>
                      <li> measures to keep frame out of the beam
                      </li>
                    </ul>
                  </li>
                  <li> want to increase maximum electron beam current to
                    1 microamp
                  </li>
                  <li> want to increase solenoid current to 1300 A (to
                    1350 A for hysteresis)
                  </li>
                  <li> Alexandre will start as run coordinator, David
                    will take over, Mark I. will backup
                  </li>
                </ul>
              </li>
            </ul>
            <br>
            <span class="mw-headline" id="Electronics.2C_Fernando">Electronics,
              Fernando</span><br>
            <ul>
              <li> HVBs for CDC all installed, finishing cabling
                <ul>
                  <li> will start powering HV and LV as test
                  </li>
                  <li> then connect signal cables, look at signals
                  </li>
                  <li> then turn on gas system
                  </li>
                  <li> run with pulser in FADC, scan all channels
                  </li>
                </ul>
              </li>
              <li> cables for polarimeter
                <ul>
                  <li> little advance notice
                  </li>
                  <li> 32 + 24 coax cables needed, will exhaust spares
                    on hand
                  </li>
                  <li> ASU will bring power supply
                  </li>
                </ul>
              </li>
              <li> master oscillator
                <ul>
                  <li> tagger and hall fibers in
                  </li>
                  <li> next chassis will come from Accel.
                  </li>
                  <li> cables being ordered, from Accel. chassis to MO
                    module
                  </li>
                  <li> MO module working, USM design
                    <ul>
                      <li> Alam Toro working on firmware, can run
                        without it if pressed
                      </li>
                      <li> can step down by factor 128
                      </li>
                      <li> for F1, under 5 MHz needed
                      </li>
                    </ul>
                  </li>
                </ul>
              </li>
              <li> F125s: 25 modules came in, only 5% failure rate
              </li>
            </ul>
            <br>
            <span class="mw-headline" id="Run_Planning.2C_Alexandre">Run
              Planning, Alexandre</span><br>
            <ul>
              <li> will use same structure for plan as for Fall
              </li>
              <li> times, goals similar
              </li>
              <li> detailed plan being put together
                <ul>
                  <li> so far: target, electron beam, photon beam
                  </li>
                  <li> major items:
                    <ol>
                      <li> target
                      </li>
                      <li> diamond
                      </li>
                      <li> 1300 A
                      </li>
                    </ol>
                  </li>
                  <li> items of note:
                    <ol>
                      <li> DAQ, block mode, 20 kHz
                      </li>
                      <li> RF timing
                      </li>
                      <li> TAC
                      </li>
                      <li> polarimeter
                      </li>
                    </ol>
                  </li>
                  <li> other items:
                    <ol>
                      <li> complete detector calibration and alignment
                      </li>
                      <li> trigger optimization
                      </li>
                      <li> pair spectrometer trigger
                      </li>
                      <li> suppress FCAL noise
                      </li>
                      <li> beam stability and fast feed-back
                      </li>
                      <li> monitoring transmission through collimators
                      </li>
                    </ol>
                  </li>
                </ul>
              </li>
            </ul>
            <br>
            <span class="mw-headline" id="Safety.2C_Burt">Safety, Burt</span><br>
            <ul>
              <li> will to do evaluation of mandatory hearing protection
                zone on platform next Wed.
                <ul>
                  <li> will break vacuum window on pair spectrometer
                    vacuum box
                  </li>
                  <li> noise level will be measured
                  </li>
                  <li> request comes from engineering group
                  </li>
                </ul>
              </li>
            </ul>
            <br>
            <span class="mw-headline" id="MCP_DIRC_Read-Out.2C_Beni">MCP
              DIRC Read-Out, Beni</span><br>
            <ul>
              <li> Carl Zorn will take lead on project
              </li>
              <li> Beni will supervise student and post-doc
              </li>
              <li> Post-doc may need laser training
              </li>
            </ul>
            <br>
            <span class="mw-headline"
              id="Science_Magazine_and_GlueX.2C_Fernando">Science
              Magazine and GlueX, Fernando</span><br>
            <ul>
              <li> article in Science on JLab featured picture of CDC
              </li>
            </ul>
            <div class="printfooter">
              Retrieved from "<a
href="https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_January_26,_2015">https://halldweb1.jlab.org/wiki/index.php/Private:Hall_D_Staff_Meeting,_January_26,_2015</a>"</div>
          </div>
        </div>
      </div>
      <div id="footer">
        <ul id="f-list">
          <li id="lastmod"> This page was last modified on 27 January
            2015, at 17:10.</li>
        </ul>
      </div>
    </div>
    <br>
  </body>
</html>