<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p>Please find notes from today's meeting below and <a
        moz-do-not-send="true"
href="https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_June_12,_2017">on
        the web</a>.</p>
    <p>_______________________</p>
    <p> </p>
    <div id="content" class="mw-body" role="main">
      <h1 id="firstHeading" class="firstHeading" lang="en"><span
          dir="auto">Hall D Staff Meeting, June 12, 2017</span></h1>
      <div id="bodyContent" class="mw-body-content">
        <div id="siteSub">From Gluex PRIVATE Wiki</div>
        <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
          lang="en">
          <p>Present: Thomas Britton, Eugene Chudakov (chair), Mark
            Dalton, Alexandre Deur, Hovanes Egiyan, Sergey Furletov,
            Mark Ito, David Lawrence, Paul Mattione, Lubomir Pentchev,
            Elton Smith, Sascha Somov, Simon Taylor, Beni Zihlmann
          </p>
          <h2><span class="mw-headline" id="Announcements">Announcements</span></h2>
          <p>From Eugene:
          </p>
          <ul>
            <li> Physics thinks we can survive FY18, budget-wise
              <ul>
                <li> Research budget will have to be cut</li>
                <li> 10 weeks of operations still in the plan</li>
                <li> capital spending frozen
                  <ul>
                    <li> we can spend for DIRC, 1/4 to 1/2 of one box</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Cryo group making progress with compressor
              <ul>
                <li> schedule is tight</li>
              </ul>
            </li>
            <li> readiness review for PrimEx
              <ul>
                <li> issues last time: CompCal, target
                  <ul>
                    <li> Cryo group managed to liquefy helium</li>
                    <li> got to super-fluid, but that is not possible
                      for normal operations</li>
                  </ul>
                </li>
                <li> review passed with recommendations
                  <ul>
                    <li> need to be addressed by end of July</li>
                  </ul>
                </li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline" id="Issues_for_the_October_Run">Issues
              for the October Run</span></h2>
          <ul>
            <li> Hovanes: DAQ for solenoid
              <ul>
                <li> PXI module hangs, needs multiple reboots, but then
                  OK...</li>
                <li> spare exists</li>
              </ul>
            </li>
            <li> Lubomir: FDC threshold segmentation
              <ul>
                <li> $15 k</li>
              </ul>
            </li>
            <li> David and Sergey: New RAID
              <ul>
                <li> $26 k</li>
                <li> not needed if rate not increased, can go to 650
                  MB/s</li>
              </ul>
            </li>
            <li> Hovanes: DIRC and PrimEx requirement finalization for
              slow controls/EPICS
              <ul>
                <li> Sascha: PrimEx
                  <ul>
                    <li> Hall C guys working on it</li>
                    <li> PMTs by Aug., crystals by Aug.</li>
                    <li> conceptual design for box in place</li>
                    <li> electronics: some assembly required</li>
                    <li> nothing for this run</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Elton: CPP
              <ul>
                <li> UMass has full-scale prototype</li>
                <li> will bring down this summer, install behind forward
                  carriage</li>
                <li> Tim needs a plan/budget</li>
              </ul>
            </li>
            <li> Lubomir: TRD
              <ul>
                <li> modify to increase drift distance</li>
                <li> will run again</li>
              </ul>
            </li>
            <li> Sasha: firmware
              <ul>
                <li> work starts middle of July</li>
                <li> 4 ns shift:
                  <ul>
                    <li> Ben Raydo busy with Hall B guys</li>
                    <li> fix not guaranteed</li>
                  </ul>
                </li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline" id="Data_Analysis">Data Analysis</span></h2>
          <ul>
            <li> Thomas: 2017 data
              <ul>
                <li> last monitoring launch done, final checks in
                  progress, should start in a few days</li>
              </ul>
            </li>
            <li> Lubomir: 2016 data, version 6
              <ul>
                <li> J/ψ width increased from 8 to 13 MeV, missing
                  proton, kinematic fit</li>
              </ul>
            </li>
            <li> Simon can check the multi-photon survey, and
              multi-photons with π<sup>+</sup>π<sup>−</sup></li>
          </ul>
        </div>
        <div class="printfooter"> Retrieved from "<a dir="ltr"
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_June_12,_2017&oldid=2577">https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_June_12,_2017&oldid=2577</a>"
        </div>
      </div>
    </div>
    <div id="footer" role="contentinfo">
      <ul id="footer-info">
        <li id="footer-info-lastmod"> This page was last modified on 12
          June 2017, at 17:45.</li>
        <li id="footer-info-viewcount">This page has been accessed 2
          times.</li>
      </ul>
    </div>
    <pre class="moz-signature" cols="72">-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org">marki@jlab.org</a>, (757)269-5295
</pre>
  </body>
</html>