<html>
  <head>
    <meta http-equiv="Content-Type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p>Find Steve's slides on the Safety Culture Survey at<br>
    </p>
    <p> 
      <a class="moz-txt-link-freetext" href="https://halldweb.jlab.org/talks/2017/PHY%20April%202017%20rev1.pptx">https://halldweb.jlab.org/talks/2017/PHY%20April%202017%20rev1.pptx</a></p>
    <p>They are also linked from the notes on the private wiki now.<br>
    </p>
    <br>
    <div class="moz-cite-prefix">On 07/24/2017 04:51 PM, Mark Ito wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:8cc0c34d-e763-6f43-dba0-abd417b867de@jlab.org">
      <meta http-equiv="content-type" content="text/html; charset=utf-8">
      <p>Please find the notes below and at
        <a class="moz-txt-link-freetext"
href="https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_July_24,_2017"
          moz-do-not-send="true">https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_July_24,_2017</a></p>
      <p>__________</p>
      <p> </p>
      <div id="content" class="mw-body" role="main">
        <h1 id="firstHeading" class="firstHeading" lang="en"><span
            dir="auto">Hall D Staff Meeting, July 24, 2017</span></h1>
        <div id="bodyContent" class="mw-body-content">
          <div id="siteSub">From Gluex PRIVATE Wiki</div>
          <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
            lang="en">
            <p>Present: Alexander Austregesilo, Thomas Britton, Eugene
              Chudakov (chair), Mark Dalton, Hovanes Egiyan, Mark Ito,
              David Lawrence, Paul Mattione, Lubomir Pentchev, Elton
              Smith, Steve Smith, Simon Taylor </p>
            <div id="toc" class="toc">
              <div id="toctitle">
                <h2>Contents</h2>
              </div>
              <ul>
                <li class="toclevel-1 tocsection-1"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Safety_Culture_Survey.2C_Steve"
                    moz-do-not-send="true"><span class="tocnumber">1</span>
                    <span class="toctext">Safety Culture Survey, Steve</span></a></li>
                <li class="toclevel-1 tocsection-2"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Hall_Status.2C_Eugene"
                    moz-do-not-send="true"><span class="tocnumber">2</span>
                    <span class="toctext">Hall Status, Eugene</span></a></li>
                <li class="toclevel-1 tocsection-3"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Carbon_Dioxide_Switch-Over_Valve.2C_Lubomir"
                    moz-do-not-send="true"><span class="tocnumber">3</span>
                    <span class="toctext">Carbon Dioxide Switch-Over
                      Valve, Lubomir</span></a></li>
                <li class="toclevel-1 tocsection-4"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Analysis_Launches_and_Software.2C_Paul"
                    moz-do-not-send="true"><span class="tocnumber">4</span>
                    <span class="toctext">Analysis Launches and
                      Software, Paul</span></a></li>
                <li class="toclevel-1 tocsection-5"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#PAC.2C_Eugene"
                    moz-do-not-send="true"><span class="tocnumber">5</span>
                    <span class="toctext">PAC, Eugene</span></a></li>
                <li class="toclevel-1 tocsection-6"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Run_Readiness"
                    moz-do-not-send="true"><span class="tocnumber">6</span>
                    <span class="toctext">Run Readiness</span></a></li>
                <li class="toclevel-1 tocsection-7"><a
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_July_24,_2017&printable=yes#Hall_B_Ready-for-Science_Review.2C_Elton"
                    moz-do-not-send="true"><span class="tocnumber">7</span>
                    <span class="toctext">Hall B Ready-for-Science
                      Review, Elton</span></a></li>
              </ul>
            </div>
            <h2><span class="mw-headline"
                id="Safety_Culture_Survey.2C_Steve">Safety Culture
                Survey, Steve</span></h2>
            <ul>
              <li> results of the latest survey were presented</li>
              <li> survey conducted 2 months ago</li>
              <li> already presented to the Director's Safety Council</li>
              <li> questions were different this time</li>
              <li> two big take-aways:
                <ol>
                  <li> schedule pressure has led to unsafe practices</li>
                  <li> line management not supporting workers, not
                    requiring worker accountability</li>
                </ol>
              </li>
              <li> see Steve's slides for all the details, including
                statistical breakdown of results</li>
            </ul>
            <h2><span class="mw-headline" id="Hall_Status.2C_Eugene">Hall
                Status, Eugene</span></h2>
            <ul>
              <li> Tim sent in some items</li>
              <li> DIRC frame due to appear in August
                <ul>
                  <li> water purification system due to arrive at same
                    time</li>
                </ul>
              </li>
              <li> magnet cooling starts mid-August</li>
              <li> August 10, UPS battery replacement scheduled,
                allegedly non-disruptive</li>
              <li> heater went off in the Hall, temperature dropped,
                recovered now</li>
              <li> field in the permanent magnet in the tagger area
                checked, no change</li>
              <li> budget extremely tight (operations)
                <ul>
                  <li> for rest of FY, only spending to support upcoming
                    run</li>
                </ul>
              </li>
              <li> GWU hiring new postdoc to be resident at JLab: Stuart
                Fegan</li>
            </ul>
            <h2><span class="mw-headline"
                id="Carbon_Dioxide_Switch-Over_Valve.2C_Lubomir">Carbon
                Dioxide Switch-Over Valve, Lubomir</span></h2>
            <ul>
              <li> new valve not as good as the old
                <ul>
                  <li> no manual switch-over capability</li>
                </ul>
              </li>
              <li> Josh did the last change over by manually re-plumbing
                the lines</li>
              <li> old valve being readied to back into service</li>
            </ul>
            <h2><span class="mw-headline"
                id="Analysis_Launches_and_Software.2C_Paul">Analysis
                Launches and Software, Paul</span></h2>
            <ul>
              <li> Alex A. reports that the reconstruction launch for
                Spring 2017 data is finished, including post-processing
                <ul>
                  <li> 120 TB of REST data</li>
                  <li> 40 TB of coherent skim data</li>
                </ul>
              </li>
              <li> Analysis Launch being prepared
                <ul>
                  <li> 40 channels</li>
                  <li> resulting trees about 40% of REST data volume</li>
                  <li> experimenting with cuts to reduce footprint</li>
                  <li> goal is to start Friday</li>
                </ul>
              </li>
              <li> Analysis Library software: improvements in speed,
                memory usage
                <ul>
                  <li> still some memory leaks</li>
                  <li> if ready by Friday, will switch over to new
                    library</li>
                </ul>
              </li>
            </ul>
            <h2><span class="mw-headline" id="PAC.2C_Eugene">PAC, Eugene</span></h2>
            <ul>
              <li> JEF approved with no dedicated time, will run with
                GlueX
                <ul>
                  <li> replacement of inner calorimeter needs to be
                    scheduled</li>
                  <li> if central FCAL becomes damaged, new inner
                    calorimeter a possible replacement</li>
                </ul>
              </li>
              <li> K<sub>L</sub>: PAC wanted more coherent proposal with
                more detail</li>
              <li> Nuclear targets: PAC wants to combine the proposals,
                not clear how to do that</li>
              <li> PVPDF, Mark D.: question on quantifying improvement</li>
            </ul>
            <h2><span class="mw-headline" id="Run_Readiness">Run
                Readiness</span></h2>
            <ul>
              <li> David: new disk for DAQ system, bids due tomorrow</li>
              <li> Hovanes: goni survey done, one axis a bit off
                <ul>
                  <li> next: move to tagger hall, re-survey</li>
                </ul>
              </li>
            </ul>
            <h2><span class="mw-headline"
                id="Hall_B_Ready-for-Science_Review.2C_Elton">Hall B
                Ready-for-Science Review, Elton</span></h2>
            <ul>
              <li> Elton, David, and Beni Zihlmann on committee</li>
              <li> convene just before run, end of September</li>
              <li> internal review</li>
            </ul>
          </div>
        </div>
      </div>
      <pre class="moz-signature" cols="72">
-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org" moz-do-not-send="true">marki@jlab.org</a>, (757)269-5295
</pre>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Halld-jlab mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Halld-jlab@jlab.org">Halld-jlab@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/halld-jlab">https://mailman.jlab.org/mailman/listinfo/halld-jlab</a></pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org">marki@jlab.org</a>, (757)269-5295
</pre>
  </body>
</html>