    <div id="content" class="mw-body" role="main">
      <h1 id="firstHeading" class="firstHeading" lang="en"><span
          dir="auto">Hall D Staff Meeting, September 18, 2017</span></h1>
      <div id="bodyContent" class="mw-body-content">
        <div id="siteSub">From Gluex PRIVATE Wiki</div>
        <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
          lang="en">
          <p>Present: Thomas Britton, Eugene Chudakov (chair), Mark
            Dalton, Alexandre Deur, Hovanes Egiyan, Sergey Furletov,
            Mark Ito, David Lawrence, Paul Mattione, Elton Smith, Sascha
            Somov, Simon Taylor, Beni Zihlmann
          </p>
          <h2><span class="mw-headline" id="Announcements">Announcements</span></h2>
          <p>Eugene:
          </p>
          <ul>
            <li> accelerator schedule is out
              <ul>
                <li> accelerator readiness is on track, might be some
                  tightening of schedule</li>
              </ul>
            </li>
            <li> ARM policy change, see Eugene's email to the group.
              <ul>
                <li> rapid access will help</li>
              </ul>
            </li>
            <li> Sascha and Scot Spiegel promoted, congratulations! </li>
          </ul>
          <h2><span class="mw-headline" id="Preparations_for_Run">Preparations
              for Run</span></h2>
          <p>Eugene:
          </p>
          <ul>
            <li> U-tubes for solenoid going in today</li>
            <li> goni surveyed last week</li>
            <li> DIRC parts (water purification system) arrive this week
              <ul>
                <li> other items pushed back</li>
                <li> frame parts arrive in November</li>
              </ul>
            </li>
          </ul>
          <p>Elton:
          </p>
          <ul>
            <li> New prototype muon chamber, 64" square
              <ul>
                <li> downstream of FCAL platform</li>
                <li> may interfere with TAC measurement</li>
                <li> info being prepared on the DocDB</li>
                <li> operating instructions being added to wiki</li>
                <li> will be received in the EEL, staged there</li>
                <li> will be read-out with regular trigger
                  <ul>
                    <li> some special testing with TOF triggers planned</li>
                  </ul>
                </li>
              </ul>
            </li>
          </ul>
          <p>Sergey:
          </p>
          <ul>
            <li> TRD[?] may go in again
              <ul>
                <li> need trigger hook-up, documentation</li>
              </ul>
            </li>
          </ul>
          <p>Hovanes:
          </p>
          <ul>
            <li> wires on goni already installed</li>
          </ul>
          <p>Eugene:
          </p>
          <ul>
            <li> TPOL: no local owner right now
              <ul>
                <li> JLab is buying TPOL hardware from ASU</li>
                <li> Alexandre volunteered for TPOL project</li>
              </ul>
            </li>
          </ul>
          <p>Sascha:
          </p>
          <ul>
            <li> PS crate needs re-assembly</li>
            <li> New firmware coming for the TIs, needs testing</li>
          </ul>
          <p>Sergey:
          </p>
          <ul>
            <li> have started turning on data acquisition crates</li>
          </ul>
          <h2><span class="mw-headline" id="Data_Analysis">Data Analysis</span></h2>
          <p>Eugene:
          </p>
          <ul>
            <li> high intensity running from Spring 2017 need full
              reprocessing
              <ul>
                <li> Paul: this should take 3 weeks, with needed
                  calibrations 5 weeks</li>
              </ul>
            </li>
          </ul>
          <p>Beni:
          </p>
          <ul>
            <li> looking tagger peak with PS triggers and physics
              trigger
              <ul>
                <li> sees differences between high and low intensity
                  running in Spring 2017</li>
                <li> also dependence on diamond orientation</li>
              </ul>
            </li>
          </ul>
          <p>Elton:
          </p>
          <ul>
            <li> putting in geometry of CPP</li>
            <li> found code has assumption of 65 cm target position in
              several places
              <ul>
                <li> in particular, plane of RF set there</li>
                <li> not all software components were consistent on this
                  choice
                  <ul>
                    <li> problems now fixed as far as he can tell</li>
                  </ul>
                </li>
              </ul>
            </li>
          </ul>
        </div>
        <div class="printfooter"> Retrieved from "<a dir="ltr"
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_September_18,_2017&oldid=2978">https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_September_18,_2017&oldid=2978</a>"
        </div>
      </div>
    </div>
    <div id="footer" role="contentinfo">
      <ul id="footer-info">
        <li id="footer-info-lastmod"> This page was last modified on 18
          September 2017, at 16:04.</li>
        <li id="footer-info-viewcount">This page has been accessed once.</li>
      </ul>
    </div>
    <pre class="moz-signature" cols="72">-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org">marki@jlab.org</a>, (757)269-5295
</pre>
  </body>
</html>