    <p>Folks,</p>
    <p>Please find the notes below and by clicking <a
        moz-do-not-send="true"
href="https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_August_6,_2018">here</a>.</p>
    <p>  -- Mark</p>
    <p>___________________________________________</p>
    <p> </p>
    <div id="content" class="mw-body" role="main">
      <h1 id="firstHeading" class="firstHeading" lang="en"><span
          dir="auto">Hall D Staff Meeting, August 6, 2018</span></h1>
      <div id="bodyContent" class="mw-body-content">
        <div id="siteSub">From Gluex PRIVATE Wiki</div>
        <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
          lang="en">
          <p>Present: Alexander Austregesilo, Thomas Britton, Eugene
            Chudakov (chair), Mark Dalton, Hovanes Egiyan, Sergey
            Furletov, Mark Ito, David Lawrence, Patrizia Rossi, Sascha
            Somov, Beni Zihlmann
          </p>
          <ul>
            <li> Announcements (Eugene)
              <ul>
                <li> CHL2 down
                  <ul>
                    <li> transformer failed this morning, switch made to
                      CHL1</li>
                    <li> can run 4 K for both linacs</li>
                    <li> spare transformer was out for repair, will be
                      delivered tomorrow</li>
                  </ul>
                </li>
                <li> FY18 budget has arrived
                  <ul>
                    <li> can spend against it now</li>
                    <li> ordering 70 k$ of FADC-250s</li>
                    <li> thinking about spare parts for crates</li>
                  </ul>
                </li>
                <li> New accelerator associate director: Andrei Seryi
                  <ul>
                    <li> New deputy: Mike Spata</li>
                  </ul>
                </li>
                <li> 2K cold box in final review
                  <ul>
                    <li> installation in 2020, 6-7 month down period</li>
                  </ul>
                </li>
                <li> Solid detector cost estimate in: approx. 60 M$</li>
                <li> Cooling water repair done today
                  <ul>
                    <li> Beni: successful
                      <ul>
                        <li> Upstream BCAL chiller had problem,
                          replaced, new one won't turn on</li>
                      </ul>
                    </li>
                    <li> FM hoped for bad cable as root cause of water
                      problem
                      <ul>
                        <li> if not got to alternate scheme until winter</li>
                      </ul>
                    </li>
                  </ul>
                </li>
                <li> DIRC optical box delayed, due in Aug. 12
                  <ul>
                    <li> Plan: fill with water, leak check</li>
                    <li> schedule very tight</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Preparations for Run
              <ul>
                <li> long list of items from Tim
                  <ul>
                    <li> cryo box on magnet almost empty, but
                      refrigerator started</li>
                    <li> solenoid HCO on Wed.</li>
                    <li> vacuum by 8/17</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Sergey
              <ul>
                <li> old and new file servers in hand</li>
                <li> waiting for Sascha's work to complete before
                  switching</li>
              </ul>
            </li>
            <li> Sascha
              <ul>
                <li> last week cosmics taken
                  <ul>
                    <li> new ROCCDC1 did not work, reverted firmware to
                      old version</li>
                    <li> ran BCAL cosmic trigger</li>
                  </ul>
                </li>
                <li> working on new firmware for DIRC SSP
                  <ul>
                    <li> firmware like Hall B RICH</li>
                    <li> having library compatibility problems</li>
                    <li> trying to unify libraries with Ben Raydo</li>
                    <li> trigger SSP needs modification</li>
                  </ul>
                </li>
                <li> ready to start the run</li>
                <li> DIRC: special crate, optical connection there
                  <ul>
                    <li> lacks SSP read-out</li>
                    <li> LED system going in, CAEN 1495 used to drive
                      LEDs</li>
                    <li> will be ready for run</li>
                  </ul>
                </li>
                <li> CompCal
                  <ul>
                    <li> 10 FADCs in crate, connected to read-out</li>
                    <li> Needs connection to trigger system, Ben will do
                      that after finishing DIRC</li>
                    <li> CAEN 1495, LED system installed</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Sergey
              <ul>
                <li> Plan is to move to new file server</li>
                <li> will test new high-performance CODA</li>
                <li> also working on C version</li>
              </ul>
            </li>
            <li> David
              <ul>
                <li> computers restarted today</li>
                <li> new run period set up</li>
                <li> GUIs on workstations lock up under RHEL7</li>
              </ul>
            </li>
            <li> Hovanes
              <ul>
                <li> gluon29, host of soft IOCs, crashed</li>
                <li> won't start, moved IOCs to gluon30</li>
                <li> may have to re-arrange applications, alarm server
                  was running there</li>
                <li> David: seems really dead, two PSs for redundancy
                  and neither works</li>
                <li> gluon49 is also dead, but that happened a long,
                  long time ago</li>
              </ul>
            </li>
            <li> Beni
              <ul>
                <li> chambers: turning them on, communication with HV an
                  issue, problems restoring voltages
                  <ul>
                    <li> Hovanes: IOC host ran out of memory today</li>
                  </ul>
                </li>
                <li> BCAL LV crate failed, PS replaced, no more spares
                  <ul>
                    <li> everything back on</li>
                  </ul>
                </li>
                <li> TAC removed from Hall
                  <ul>
                    <li> in EEL, Ashot Gasparian will take a look at it</li>
                    <li> goes back to Hall 7/14</li>
                  </ul>
                </li>
                <li> Lubomir Pentchev checked FDC before his vacation,
                  sees signals</li>
                <li> left a set of voltages to use</li>
              </ul>
            </li>
            <li> Mark D.
              <ul>
                <li> took data with BCAL, SiPMs working</li>
                <li> need chillers to work</li>
                <li> FCAL: Colin Gleason has 20 bases to replace</li>
              </ul>
            </li>
            <li> Alex A.
              <ul>
                <li> full reconstruction of 2016 and 2017 underway</li>
                <li> using LQCD nodes on loan, and new nodes purchased
                  for farm</li>
                <li> 80% of 2016 done, all of 2017 workfest</li>
                <li> analysis launch started on workfest data</li>
                <li> last week: 500 bad jobs, got only 2 GB of 20 GB
                  input file transferred, only 1% of total processing</li>
                <li> will start complete 2017 in next few days, should
                  take 20 days</li>
                <li> running 800 jobs at a time now (no new nodes at
                  present)</li>
              </ul>
            </li>
            <li> Mark I.
              <ul>
                <li> sim-recon git repository split into two separate
                  repositories last week</li>
                <li> no major problems so far</li>
              </ul>
            </li>
            <li> David
              <ul>
                <li> NERSC test: Chris Larrieu back, want to get beyond
                  20 jobs at a time
                  <ul>
                    <li> limited by disk space</li>
                    <li> goal: monitoring launch on 2018 Spring data</li>
                    <li> outgoing bandwidth of only 100-200 MB/s seen</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Sascha
              <ul>
                <li> CompCal to Hall, need to schedule move</li>
                <li> 120 of 140 modules assembled</li>
                <li> frame will be ready by end of month</li>
                <li> Hovanes: movable stage tested at high level by
                  Vanik</li>
              </ul>
            </li>
            <li> Hovanes
              <ul>
                <li> CompCal, DIRC controls will have to be done during
                  3 week break in Nov.</li>
                <li> Other controls in good shape</li>
                <li> will work on gluon29/30 today</li>
                <li> Vanik coming: will fix CompCal GUI, test motion
                  system</li>
                <li> DIRC: work for Vanik
                  <ul>
                    <li> HV system: no GUI yet</li>
                    <li> LV system: there is a bug, no GUI yet
                      <ul>
                        <li> MPOD lost to spare pool</li>
                      </ul>
                    </li>
                    <li> water and gas system done by Nick Sandoval</li>
                    <li> request for readout of temp for each board,
                      scalers for each channel
                      <ul>
                        <li> will need working system to develop these</li>
                      </ul>
                    </li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Beni
              <ul>
                <li> solenoid PXI needs looking at</li>
              </ul>
            </li>
            <li> Sascha
              <ul>
                <li> 2 pair spect. channels fixed</li>
              </ul>
            </li>
          </ul>
        </div>
        <div class="printfooter"> Retrieved from "<a dir="ltr"
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_August_6,_2018&oldid=5714">https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_August_6,_2018&oldid=5714</a>"
        </div>
      </div>
    </div>
    <div id="footer" role="contentinfo">
      <ul id="footer-info">
        <li id="footer-info-lastmod"> This page was last modified on 6
          August 2018, at 17:20.</li>
        <li id="footer-info-viewcount">This page has been accessed once.</li>
      </ul>
    </div>
    <pre class="moz-signature" cols="72">-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org">marki@jlab.org</a>, (757)269-5295
</pre>