<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p>Folks,</p>
    <p>Please find the notes below and at this <a
        moz-do-not-send="true"
href="https://halldweb.jlab.org/wiki-private/index.php/Hall_D_Staff_Meeting,_September_17,_2018">link</a>.</p>
    <p>  -- Mark</p>
    <p>_______________</p>
    <p> </p>
    <div id="content" class="mw-body" role="main">
      <h1 id="firstHeading" class="firstHeading" lang="en"><span
          dir="auto">Hall D Staff Meeting, September 17, 2018</span></h1>
      <div id="bodyContent" class="mw-body-content">
        <div id="siteSub">From Gluex PRIVATE Wiki</div>
        <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
          lang="en">
          <p>Present: Alexander Austregesilo, Eugene Chudakov (chair),
            Hovanes Egiyan, Sergey Furletov, Mark Ito, Elton Smith, Tim
            Whitlatch, Beni Zihlmann
          </p>
          <ul>
            <li> Announcements (Eugene)
              <ul>
                <li> the Lab will soon convert to total time accounting</li>
                <li> IT is getting rid of Zimbra. Replacement unknown at
                  present.</li>
                <li> Job description components will change</li>
                <li> July: CD0 for another wing of CEBAF Center
                  approved. Wing D</li>
                <li> EIC: JLab will finish pre-CDR by end of month</li>
                <li> Software and Computing Review (Director's Review)
                  <ul>
                    <li> all Halls, Computer Center, requests for
                      resources, provision of resources</li>
                    <li> Hall B, Super Big Bite, Moller and Solid
                      special attention</li>
                    <li> Nov. 27, 28</li>
                  </ul>
                </li>
                <li> Running plan proposed: keep schedule as is, move
                  lost time to end of March
                  <ul>
                    <li> How experimental time accounting will apply not
                      clear</li>
                    <li> Issues: low/high energy running periods,
                      installation activities, commissioning installed
                      detectors, low-energy physics,...</li>
                  </ul>
                </li>
                <li> Spin conference: considerable interest in J/ψ
                  result
                  <ul>
                    <li> connection between proton mass and shape of J/ψ
                      cross section at threshold as a function of energy</li>
                  </ul>
                </li>
              </ul>
            </li>
            <li> Sergey took some cosmic data
              <ul>
                <li> with new CODA</li>
                <li> also did test of C-based event builder using
                  simplified EVIO format</li>
              </ul>
            </li>
            <li> Elton on detector turn-on problems
              <ol>
                <li> tagger HV channel won't come on</li>
                <li> FDC chiller: interlock needs to be defeated before
                  attempting turn on, Lubomir got it going</li>
                <li> Upstream BCAL chiller looks good now</li>
              </ol>
            </li>
            <li> Hovanes: no spare chiller</li>
            <li> Eugene: PAC and lab management interested in seeing a
              white paper from Hall D
              <ul>
                <li> nuclear targets</li>
                <li> polarized target</li>
                <li> K<sub>L</sub></li>
              </ul>
            </li>
            <li> Tim on Hall preparations
              <ul>
                <li> BCAL chiller back</li>
                <li> solenoid liquid level measurements: no joy</li>
                <li> spare chiller would cost $13k</li>
                <li> DIRC optical box in ESB
                  <ul>
                    <li> mirror box due Wed.</li>
                  </ul>
                </li>
                <li> CompCal moving along, restack decision to come</li>
              </ul>
            </li>
            <li> Elton: quarterly DOE report on scientific output of Lab
              <ul>
                <li> for staff: put things in publication database, info
                  can be pulled from there</li>
                <li> gave Linda point to GlueX list of talks</li>
              </ul>
            </li>
          </ul>
        </div>
        <div class="printfooter"> Retrieved from "<a dir="ltr"
href="https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_September_17,_2018&oldid=6038">https://halldweb.jlab.org/wiki-private/index.php?title=Hall_D_Staff_Meeting,_September_17,_2018&oldid=6038</a>"
        </div>
      </div>
    </div>
    <div id="footer" role="contentinfo">
      <ul id="footer-info">
        <li id="footer-info-lastmod"> This page was last modified on 17
          September 2018, at 16:38.</li>
        <li id="footer-info-viewcount">This page has been accessed once.</li>
      </ul>
    </div>
    <pre class="moz-signature" cols="72">-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org">marki@jlab.org</a>, (757)269-5295
</pre>
  </body>
</html>