<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body>
    <p>Folks,</p>
    <p>Please find the notes here and below.</p>
    <p>  -- Mark</p>
    <p>__________________________________________________</p>
    <p> </p>
    <div id="content" class="mw-body" role="main">
      <h2 id="firstHeading" class="firstHeading" lang="en"><span
          dir="auto">Hall D Staff Meeting, November 23, 2020</span></h2>
      <div id="bodyContent" class="mw-body-content">
        <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
          lang="en">
          <p>Present: Alexander Austregesilo, Eugene Chudakov (chair),
            Mark Dalton, Alexandre Deur, Hovanes Egiyan, Sergey
            Furletov, Mark Ito, Igal Jaegle, Keigo Mizutani, Lubomir
            Pentchev, Elton Smith, Sascha Somov, Simon Taylor, Tim
            Whitlatch, Beni Zihlmann
          </p>
          <h2><span class="mw-headline" id="Announcements.2C_Eugene">Announcements,
              Eugene</span></h2>
          <ul>
            <li> There was a quarantine issue with the machine shop.
              Resolved now.</li>
            <li> Memo went out about working remotely from a different
              state.</li>
            <li> Initial budget outlook: looks about the same as last
              year.</li>
            <li> User count dropped from 1700 to 1600. Number of foreign
              users went down. Domestic university users went up a bit.</li>
            <li> Fill out your timesheets daily.</li>
            <li> For computers used at home, make sure to keep property
              passes up-to-date.</li>
            <li> EIC Yellow Paper process entering final stages.
              <ul>
                <li> Discussion on including a second detector and ways
                  to fund it.
                  <ul>
                    <li> Not part of current DOE plan.</li>
                    <li> Beni: machine design can accommodate two
                      detectors.</li>
                  </ul>
                </li>
                <li> JLab will participate in detector R&D
                  <ul>
                    <li> Will bring in local expertise with lead
                      tungstate crystal calorimeters.</li>
                  </ul>
                </li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline"
              id="Tasks_for_Rest_of_the_Year.2C_Tim">Tasks for Rest of
              the Year, Tim</span></h2>
          <ul>
            <li> Big one: DIRC tests and experiments
              <ul>
                <li> Take apart optical box, test mirrors</li>
                <li> Schedule on the O-drive</li>
              </ul>
            </li>
            <li> Tagger window done, hodoscope and microscope
              re-installed</li>
            <li> Leak in Hall: Tim will look into it</li>
            <li> Coil 3:
              <ul>
                <li> After refurbishment of cold cathode gauge showed
                  measurable leak rate.</li>
                <li> Not as bad as coils 2 and 4. </li>
                <li> Pumping on it now</li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline"
              id="Cleaning_electronics_boards.2C_Beni">Cleaning
              electronics boards, Beni</span></h2>
          <ul>
            <li> Not all cleaned, but project stopped because of limited
              space</li>
            <li> Eugene: analysis of dust showed some iron, probably in
              the form of iron oxide</li>
          </ul>
          <h2><span class="mw-headline" id="Crystals.2C_Sascha">Crystals,
              Sascha</span></h2>
          <ul>
            <li> Almost done measuring dimensions, doing visual
              inspection
              <ul>
                <li> of 160, 8 still left to check</li>
                <li> better than previous batch, some have coloring</li>
                <li> will likely accept for purchase</li>
              </ul>
            </li>
            <li> Will touch base with Carl Zorn about measuring
              transmittance</li>
            <li> Balance of contracted crystals will be sent in a few
              weeks.</li>
            <li> Josh and Sascha have exercised brazing set-up.
              <ul>
                <li> Will assemble 10 to 20 modules, then go to mass
                  production</li>
              </ul>
            </li>
            <li> CompCal is open in the TEDF
              <ul>
                <li> Will be meeting with Fernando to finalize
                  electronics</li>
                <li> Refurbishing light monitoring system for CCAL</li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline"
              id="Measurements_with_Gas_Analyzer.2C_Lubomir">Measurements
              with Gas Analyzer, Lubomir</span></h2>
          <ul>
            <li> To be done this year</li>
          </ul>
          <h2><span class="mw-headline" id="PMT_Replacement.2C_Beni">PMT
              Replacement, Beni</span></h2>
          <ul>
            <li> one candidate for replacement</li>
            <li> no need to dismount array from forward carriage</li>
            <li> need detailed instructions from Paul Eugenio</li>
          </ul>
          <h2><span class="mw-headline" id="DIRC_Mirrors.2C_Eugene">DIRC
              Mirrors, Eugene</span></h2>
          <ul>
            <li> Water leaked between the mirror and the protective
              glass cover</li>
            <li> Diffusers for the LED system leaked as well</li>
            <li> Alternate geometries for sealing mirrors being
              considered.</li>
            <li> No measurable degradation in performance.</li>
          </ul>
        </div>
        <br>
      </div>
    </div>
  </body>
</html>