    <div id="content" class="mw-body" role="main">
      <h1 id="firstHeading" class="firstHeading" lang="en"><span
          dir="auto">Hall D Staff Meeting, April 5, 2022</span></h1>
      <div id="bodyContent" class="mw-body-content">
        <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
          lang="en">
          <h2><span class="mw-headline" id="Announcements.2C_Eugene">Announcements,
              Eugene</span></h2>
          <ul>
            <li> Accelerator SAD work on track
              <ul>
                <li> beam in Hall starting in June</li>
                <li> mid-April: CHL1 will go to 2K</li>
              </ul>
            </li>
            <li> HUGS will be in-person this year</li>
            <li> New Lab Occupational Medicine physician on-board</li>
            <li> New head of Tech Transfer for Lab on-board</li>
            <li> Rusty Sprouse, head of Facilities, will retire in
              November</li>
            <li> Run Around scheduled for May 25</li>
            <li> Budget
              <ul>
                <li> still on CR spending basis, no big procurements
                  allowed</li>
                <li> FY22 looks good, President's FY23 has smaller
                  increase</li>
              </ul>
            </li>
            <li> Accelerator power limits are under discussion
              <ul>
                <li> Main effect is on current limits for Halls A and C</li>
                <li> proposal: increase to 1.1 MW from 0.9 MW</li>
                <li> limit is administrative, not imposed by physical
                  infrastructure</li>
                <li> going to 2.0 MW attractive, but would require
                  modification to the dumps</li>
              </ul>
            </li>
            <li> New Hall D positions
              <ul>
                <li> applications in for two positions</li>
                <li> 5-6 candidates will be invited for interviews</li>
                <li> Boris Grube has obtained his visa</li>
              </ul>
            </li>
            <li> Alex: status of requirements for on-site work?
              <ul>
                <li> Eugene: on-site work is allowed, but not required</li>
                <li> expect announcement from Director's Office on new
                  policy soon</li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline" id="Work_in_Hall.2C_Tim">Work in
              Hall, Tim</span></h2>
          <ul>
            <li> we start Hot Check-Out in six weeks</li>
            <li> finishing CPP installation
              <ul>
                <li> still need signal cables</li>
                <li> will use 3×3 Crystal array for TAC</li>
                <li> need helium bag inside CDC</li>
                <li> target pieces fiducialized, install them near the
                  end</li>
              </ul>
            </li>
            <li> chiller maintenance: replace some bad pressure gauges</li>
            <li> beamline vacuum pump maintenance to be done</li>
            <li> FCAL2 drawings getting finalized</li>
            <li> K<sub>L</sub>: target temperature calculations underway</li>
            <li> dates for Hall PSS system checks not set yet</li>
          </ul>
          <h2><span class="mw-headline"
              id="CPP.2FNPP_Preparations.2C_Beni">CPP/NPP Preparations,
              Beni</span></h2>
          <ul>
            <li> MWPCs have been installed
              <ul>
                <li> first 3 chambers have been checked, some low-level
                  noise to be addressed</li>
                <li> missing most of the signal cables, first batch was
                  due in last Friday, will check with Chris Stanislav on
                  that</li>
              </ul>
            </li>
            <li> scintillator paddles are installed, but not cabled up</li>
            <li> muon trigger using paddles not set-up yet</li>
            <li> F125 CDC crate re-located for use with MWPCs
              <ul>
                <li> ethernet connected</li>
                <li> still need fiber to connect TI to TS</li>
              </ul>
            </li>
            <li> additional CAEN TDC installed for scintillator channels
              <ul>
                <li> Sergey performed the needed firmware upgrade</li>
                <li> Beni will adjust the least-count resisters, do the
                  integrated non-linearity correction calibration</li>
              </ul>
            </li>
          </ul>
          <h2><span class="mw-headline"
              id="FCAL2_Preparations.2C_Eugene">FCAL2 Preparations,
              Eugene</span></h2>
          <ul>
            <li> modules are being produced a rate of about 30 per week</li>
            <li> labor-intensive activity, students from various
              institutions have and will be involved</li>
          </ul>
          <h2><span class="mw-headline" id="JT2GO_Demo">JT2GO Demo</span></h2>
          <p>Tim invited us: Friday, April 8 1:00 pm on Teams (see your
            calendar entry).
          </p>
          <p>Our Hall D Engineering co-op student (Anthony Palazzo) will
            be giving a demonstration of how to use free software to
            pull up 3D models of Hall D equipment and easily manipulate
            and measure things. Anthony and Stephanie have been working
            over the past few months to put this together.
          </p>
        </div>