[Halld-level1] Electrical-->Optical and Optical-->Electrical converter modules
Elton Smith
elton at jlab.org
Fri Jun 20 06:41:01 EDT 2014
Hi Chris,
Good summary. This type of information should also be posted in the
electronic log book
https://logbooks.jlab.org/book/halld
If you enter 'halld-level1 at jlab.org' in the box 'Notify' you make an
entry into the log as well as send a message to the listserver.
Cheers, Elton.
Elton Smith
Jefferson Lab MS 12H3
12000 Jefferson Ave STE 4
Newport News, VA 23606
(757) 269-7625
(757) 269-6331 fax
On 6/19/14 10:54 PM, Alexander Somov wrote:
> Thanks Chris, perfect !
>
> Cheers,
> Alex
>
>
> ----- Original Message -----
> From: "Chris Cuevas" <cuevas at jlab.org>
> To: halld-level1 at jlab.org
> Cc: "Alexander Somov" <somov at jlab.org>
> Sent: Thursday, June 19, 2014 4:00:32 PM
> Subject: Electrical-->Optical and Optical-->Electrical converter modules
>
> I installed an Electrical->Optical (EO) module into the TOF crate.
> (D2-1-TOP; slot#20). There are six ST style fiber connectors plugged
> into each of the optical output ports and short coaxial cables are
> installed for the input ports. The inputs are configured to accept a
> standard NIM level.
>
> The Optical-->Electrical (OE) module is installed in the TS-TD crate.
> (U14-Top; slot#20). Six ST style fiber connectors are plugged into
> each of the optical inputs and I will need to install short coaxial
> adapter cables so the NIM signals can be connected to a NIM-->ECL converter.
>
> As soon as the Tagger crates are installed we can place a EO module in
> one of the crates closest to the Tagger tunnel trigger fiber optic patch
> panel and use the optical trunk lines to transport any signals needed
> for diagnostics etc to the Hall D Trigger rack.
>
> -Chris
> ~~~~~~~~~~~~~
>
> _______________________________________________
> Halld-level1 mailing list
> Halld-level1 at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-level1
More information about the Halld-level1
mailing list