[Halld-level1] [New Logentry] Trigger for production run
somov at jlab.org
somov at jlab.org
Sat May 2 02:45:02 EDT 2015
Logentry Text:
--
We are taking data with the main 'soft' production trigger for the pi0 calibration:
BCAL / (0.25 GeV) + FCAL / (0.5 GeV) > 1
There are some issues with the FCAL & BCAL trigger but they should not affect
much collecting pi0 samples (we'll debug these problems after the beam test )
Currently, there are 4 triggers in the system:
--------------------------------------------------------
1. 10 FCAL + 3 BCAL > 18000 (mentioned above)
2. FCAL > 1800
3. BCAL > 6000
4. PS
see rated on attached plot attached
The number of peaks in the FADC250 readout was changed to 3
( the production config file is FCAL_BCAL_m7(8).conf )
Pi0 peaks look Ok for both read out modes 7 and 8
We take data with 2 converters: 75 um Be TPOL and the main 10^-3 PS
The PS coincidence rate for 60 nA beam current and 10-4 radiator is about 500 Hz
(TPOL converter contributes ~100 Hz)
The data size in mode 7 is dominated by TPOL fadcs
(we have to read out TPOL fadcs in mode 8, pulses have positive polarity :) )
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3337749
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-level1/attachments/20150502/e79ae49e/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: mult_trig_screen_run3179_m7.png
Type: image/png
Size: 14092 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/halld-level1/attachments/20150502/e79ae49e/attachment-0002.png>
More information about the Halld-level1
mailing list