[Halld-pid-upgrade] [EXTERNAL] Commissioning of the GlueX DIRC at JLab abstract

Roman Dzhygadlo r.dzhygadlo at gsi.de
Tue Nov 26 05:51:52 EST 2019


Dear colleagues,

below is an abstract for a DPG meeting (Deutsche Physikalische 
Gesellschaft, Apr 2020). Please let me know if you have some 
comments/suggestions (preferably before Dec 29).

best regards,
Roman

-- 
Dr. Roman Dzhygadlo
phone: +49 6159 713135
fax: +49 6159 713762
e-mail: r.dzhygadlo at gsi.de

GSI Helmholtzzentrum für Schwerionenforschung GmbH
Planckstraße 1, 64291 Darmstadt, Germany, https://urldefense.proofpoint.com/v2/url?u=http-3A__www.gsi.de&d=DwIDaQ&c=CJqEzB1piLOyyvZjb8YUQw&r=GBOG1qCrCJcBn8meAZu0lSYv5VdWygcuqLab-ELGz3M&m=wEd7ggXtAc8YcInmWi5Oo3CFzJLx85A5OYw956jzHL8&s=G52zAFl-uGzcHJUaETXTWFKtzQdy-z6tbWUXYepNehQ&e= 

Commercial Register / Handelsregister: Amtsgericht Darmstadt, HRB 1528
Managing Directors / Geschäftsführung:
Professor Dr. Paolo Giubellino, Ursula Weyrich, Jörg Blaurock
Chairman of the Supervisory Board / Vorsitzender des GSI-Aufsichtsrats:
Ministerialdirigent Dr. Volkmar Dietz



Commissioning of the GlueX DIRC at JLab

The GlueX experiment at Jefferson Laboratory aims to perform quantitative
tests of non-perturbative QCD by studying the spectrum
of light-quark mesons and baryons. The Detector of Internally
Reflected Cherenkov light (DIRC) is currently being installed to enhance
particle identification (PID) capability of the GlueX experiment by 
providing clean π/K
separation up to 4 GeV/c momenta in the forward region (θ<11 deg) which 
will allow the study
of hybrid mesons decaying into kaon final states with significantly 
higher efficiency and purity.

The new PID system is build using radiators from decommissioned BaBar DIRC
combined with new compact photon cameras based on SuperB FDIRC concept.
The first half of the system was successfully installed and
commissioned during winter 2018/2019. The full system commissioning
with beam is planned during Dec 2019. We will discuss the status of
the DIRC detector and its performance during commissioning.




More information about the Halld-pid-upgrade mailing list