[Halld-pid] Minutes, GlueX Target Meeting, Dec. 21 '10
Mark M. Ito
marki at jlab.org
Tue Dec 21 19:49:31 EST 2010
Find the minutes at
http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_Target_Meeting%2C_December_21%2C_2010#Minutes
and as text below.
===
GlueX Target Meeting, December 21, 2010
Minutes
Present:
* JLab: Hovanes Egiyan, Mark Ito (chair), Chris Keith, Yi Qiang, Tim
Whitlatch, Elliott Wolin
* UMass: Rory Miskimen
Refrigerator Capacity
Chris talked to the manufacturer of the pulse tube refrigerator we are
considering and was told that the most common use of the unit was for
helium liquefaction, so operation of a ^4He target would not be a
problem. It should provide 1.5 W at 4 K. At liquid hydrogen
temperatures is should be able to provide 20 to 30 W.
Hovanes mentioned that for photon running in Hall B with hydrogen the
target uses about 5 W. A heater is used to regulate the temperature
(and thus prevent the hydrogen from freezing). A few Watts needs to be
provided typically.
Chris also noted that in Halls A and C they typically run hydrogen at
19 K, at about 3 psi over atmospheric pressure, supercooled to avoid
bubbles.
Helium-3 requires more power and is not in the plan at present.
Work Plan
Chris plans to start work on our target system this Spring. He and Tim
have identified some of the major work areas:
* gas system
* refrigerator system
* heat transfer system
Right now he is swamped with polarized target work for Hall A.
Chris: contact physicist to be able to operate target without adult
supervision
Controls
Hovanes brought up the issue of controls.
* Chris has starting looking at the flow diagrams for the Saclay
target system in Hall B. He thinks things can probably can be
simpler.
* In Halls A and C the dependence of externally controlled valves has
been minimized; mechanical controls are used whenever possible. We
should probably do the same for Hall D.
Schedule
Mark flashed the [25]target costs and schedule that is in the current
baseline. As part of the ETC change request Tim is updating this
section (WBS 1.5.5.2) adding some new items and updating cost estimates
and starting dates. For example, the purchase of a refrigerator is not
in the current baseline. Right now both he and Chris do feel we are in
any sort of schedule trouble.
Next Meeting
We decided to meet again in 4 weeks. Mark will schedule a meeting.
Retrieved from
"http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_Target_Meeting%2C_December_21%2C_2010"
References
25. https://halldweb1.jlab.org/talks/2010-12/12%20Gev%201552%2020Dec2010%20PMC.pdf
===
More information about the Halld-pid
mailing list