[Halld-pid] Minutes, Gluex Start Counter Meeting, September 8, 2011
Mark M. Ito
marki at jlab.org
Thu Sep 8 13:45:38 EDT 2011
Folks,
Find the minutes at
http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_Start_Counter_Meeting%2C_September_8%2C_2011#Minutes
and below as text.
-- Mark
______
GlueX Start Counter Meeting, September 8, 2011
Minutes
Present:
* FIU: Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser
* JLab: Chuck Hutton, Mark Ito (chair), Tim Whitlatch, Beni Zihlmann
Review of Drawings
We reviewed drawings that Tim posted:
* [29]Werner's side view
* [30]Werner's end view
* [31]Tim et al.'s drawing from 2009
We discussed mechanical considerations for SiPM read-out:
* The big difference between the 2009 drawing and the current concept
(though not shown in Werner's drawings) is we want to use a very
short-light guide, mounting the SiPM's as close to the scintillator
as possible. There is very little space in for doing this.
* Werner prefers a 30-counter design (versus the original 40).
Fitting the SiPM's close to the counters almost forces us to this.
* It is unlikely that we can provide for cooling other than air
circulation given the space constraints.
* Werner pointed out that we could use the support tube need not be
made of Rohacell all they back to the supporting flange. A thinner,
stronger material could be used for the cantilever up to the SiPM
mounting.
* Tim et al. will generate a new drawing based on Werner's
dimensions. He will aim for the next meeting (in two weeks).
MOU
Werner reported that the University wants some changes to the MOU,
though none of them are major. He has some paper work left to do finish
generating a revised document.
Plastic Craft Scintillator
Lei has been in contact with the company. They claim they can do a
better job on the scintillator surfaces. He will send some of the
current samples back to them for re-polishing.
Communication
* The new meeting time is OK with everyone.
* We don't need the phone connection anymore. If needed it can be
requested.
Action Items
* Produce new drawings of the start counter.
* Send some samples back to Plastic Craft for re-polishing.
* Further timing tests with the SiPM.
* Get MOU changes back to JLab for review.
Retrieved from
"http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_Start_Counter_Meeting%2C_September_8%2C_2011"
References
29.
https://halldweb1.jlab.org/talks/2011-3Q/Start%20counter%20layout%20Werner-Aug%202011.pdf
30.
https://halldweb1.jlab.org/talks/2011-3Q/Start%20Counter%20layout%201%20Werner%20Aug%202011.pdf
31.
https://halldweb1.jlab.org/talks/2011-3Q/HALL-D%20HYDROGEN%20TARGET%20GENERAL%20LAYOUT.pdf
More information about the Halld-pid
mailing list