[Halld-pid] Minutes, GlueX Start Counter Meeting, April 5, 2012
Mark M. Ito
marki at jlab.org
Thu Apr 12 09:04:16 EDT 2012
Find the minutes (from Beni) at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_April_5,_2012#Minutes
and below.
_____
GlueX Start Counter Meeting, April 5, 2012
Minutes
Present:
* FIU: Puneet Khetarpal, Eric Pooser
* Jlab: Eugene Chudakov, Chuck Hutton, Beni Zihlmann(chair)
1. Juri (Hall-B), Marc Ito and Chuck Hutton did meet to discus Hall-B
start counter design.
2. FIU was not able to get into contact with machinist from McNeal who
polishes the scintillator.
3. Chuck showed [11]current design status of the start counter
drawings. The following questions were raised:
1. Hall-B uses MV2000 to wrap the scintillators. How do they do
that?
2. Why using an outer foam shell? Could this be dropped in the
installation? Maybe only use it for transport or handling?
Maybe only have some kind of tape on the outside for holding
the structure together?
3. Could the inner foam shell in the down stream nose but reduced
to half the length or even less? Only have foam during
construction but remove some of the nose when installing it?
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_April_5,_2012"
References
11. https://halldweb1.jlab.org/talks/2012-2Q/sc_4_05_12.pptx
--
Mark M. Ito
Jefferson Lab (www.jlab.org)
(757)269-5295
More information about the Halld-pid
mailing list