GlueX TOF Meeting, August 30, 2012
Minutes
Present:
* FSU: Paul Eugenio, Sasha Ostrovidov, Randall Smith, Ian Winger
* JLab: Fernando Barbosa, Mark Ito (chair), Tim Whitlatch, Beni
Zihlmann
Re-cap of Last Meeting
Paul summarized items discussed at the last meeting, on August 16.
* There was a short discussion of items purchased
* FSU gave an update on mini-TOF construction
* There was discussion of changing materials due to length and
weight.
* Sasha presented ideas on calibration.
Electronics
TDC Purchase
Fernando reported.
* The TDCs have been ordered.
* Signal distribution issues need to be planned, in particular,
additional modules need to be built by us. Hall B has prototypes of
these boards but Sergey Boyarinov thinks a new design is needed.
Flash ADCs and the Prototype
Paul expressed interest in gaining experience with flash ADCs.
* FSU has a VME 64X crate with pins removed for to accomodate the
serial connector on the Flash 250. With this set-up one must use
the internal clock on the module or provide external clock signals.
Since only one ADC is needed for this exercise, the internal clock
should be fine.
* Fernando will look and see what is available.
* Production units will go to UMass in a month, he hopes that we can
receive tested modules from UMass in late October. These will add
to the supply.
Mini-TOF Update
Randall and Ian gave the update.
* The package of bent plates arrived from JLab, but some may not
work. They were not stainless as expected. More individual plates
may have to be made.
* They are making lightguides. The long versions have been made for
the first time.
* PMT sleeves have been completed.
* Shield holders have been completed.
* Some more raw more materials are needed. Paul had transmitted the
list to Mark. He will place the order.
* This afternoon Paul and Ian will meet to discuss the gluing fixture
for assembling five paddles at once.
Contract Status
Mark reported that the final version of the contract should be going to
FSU today for signature.
Calibration and Alignment
A new version of the calibration document Sasha presented last time
will be distributed shortly.
Technical Design Report Contribution
Paul will devote some more effort to this, so as not to fall too far
behind the standard being set by the CDC and FDC groups.
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_August_30,_2012"
--
Mark M. Ito
Jefferson Lab (www.jlab.org)
(757)269-5295
More information about the Halld-pid
mailing list