GlueX TOF Meeting, February 2, 2012
Minutes
Present:
* FSU: Paul Eugenio, Sasha Ostrovidov
* JLab: Chuck Hutton, Mark Ito (chair), Tim Whitlatch, Beni Zihlmann
Minutes from the last meeting
We reviewed the [22]minutes from the January 19th meeting. Some items
received continuing discussion in this meeting. See below.
Contract
Procurement at JLab and the Office of Sponsored Research at FSU are in
touch and are exchanging information about the construction contract.
Mechanical Design
There have been a couple of conference calls with the design teams on
the design of the light guides for the half-width (or split) paddles.
We have agreement on a final design in hand.
Chuck showed the [23]latest drawings, demonstrating the assembly steps
we might follow on the floor of the Hall.
We talked a little about how the thickness of the scintillator wrapping
material affects the design. Paul agreed to send us numbers on the
thickness.
Paul showed a jig, produced by his machine shop, for gluing PMT's to
the light guides. The light guide is housed in an aluminum frame and
there is a clamp for holding the PMT while the glue dries.
Prototype Status
Sasha showed [24]results from on-going tests of the eight-stage
phototubes from Hamamatsu. The gains are a several times lower than for
the ten-stage, as expected, but still show good separation from
pedestal. Efficiency was reduced to about 80% when using a 30 mV
discriminator threshold, for triggers in the middle of the counter (no
amplification). Time resolution measurements are in the works.
TDC Choice
Paul was wondering if there is any data-acquisition-based reason for
not using the CAEN VX1290 TDC's. They see better performance with this
unit than with the F1 TDC at FSU, both with a pulser and with detector
pulses. They are purchasing the unit they have; up until now it has
been on loan from CAEN. Paul is willing to loan it out if that helps
answer any questions.
Mark promised to ask the DAQ folks if there is any fundamental reason
we cannot use it.
Action Items
1. Paul agreed to send us numbers on the thickness of the scintillator
wrapping.
2. Mark will ask about compatibility of the CAEN VX1290 TDC with the
GlueX DAQ.
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_February_2,_2012"
References
22.
https://halldweb1.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_January_19,_2012#Minutes
23. https://halldweb1.jlab.org/talks/2012-1Q/tof%20assy.pptx
24.
https://halldweb1.jlab.org/talks/2012-1Q/First%20results%20from%208-stage%20PMTs.html
--
Mark M. Ito
Jefferson Lab (www.jlab.org)
(757)269-5295
More information about the Halld-pid
mailing list