[Halld-pid] Minutes, GlueX Start Counter Meeting, March 22, 2012
Mark M. Ito
marki at jlab.org
Thu Mar 22 20:25:36 EDT 2012
In the minutes, the link to Chuck's drawings of the start counter was
missing. It is now there on the wiki. Or click on this:
https://halldweb1.jlab.org/talks/2012-1Q/sc_3_22_12.pptx
On 03/22/2012 04:06 PM, Mark M. Ito wrote:
> Folks,
>
> Find the minutes below and at
> https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_22,_2012#Minutes
>
> -- Mark
> _____
>
> GlueX Start Counter Meeting, March 22, 2012
>
> Minutes
>
> Present:
> * FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
> * JLab: Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Beni
> Zihlmann
>
> Prototype Report
>
> We are still waiting for a prototype counter from McNeal.
>
> Readout Design
>
> Since the last meeting, we had a meeting with Fernando to answer some
> basic mechanical questions. At that meeting we decided on a
> segmentation of 10, to aid alignment and to simplify fabrication of the
> circuit board. Since then Chuck has done some work on the design and we
> reviewed [? his slides] showing the latest version. He showed a new
> scheme for attaching the start counter to the target vacuum chamber and
> a circuit board concept showing the location of the individual SiPM SMD
> components.
>
> Cooling
>
> We had a short discussion on cooling. Fernando reported that in the
> case of the BCAL readout it was recently discovered that non-uniformity
> in the contact pressure between the cooling elements and the SiPM
> arrays was causing temperature variation channel-to-channel with
> attendant gain variation. For the start counter we plan to cool with
> air flow so the details of maintaining a stable temperature are
> different. Fernando suggested that we could use some sort of
> heat-sink/heat-spreader/radiator to make sure there are no hot spots
> among the read-out elements.
>
> Discussion of Design
>
> * Chuck asked Fernando for some details on the non-SiPM side of the
> boards, e. g. a rough profile of components, connectors, cabling,
> etc.
> * Werner suggested an alternate scheme for mounting where the entire
> start counter array, including electronics, is assembled on a
> separate rigid mounting collar independent of the target. The
> current design has the counters mounted on the vacuum chamber first
> and then the SiPM's aligned and fastened to the vacuum chamber as
> well. In the alternate scheme there would be simple way to bolt the
> mounting collar rigidly to the vacuum chamber. It would have the
> advantage of providing a simple way to detach the start counter
> from the target when/if that is required. The scheme would require
> modification of the current design of the vacuum chamber, but it
> was thought that this could be accommodated.
> * We realized that now we are at the stage where the many details of
> the mechanical design that need to be worked out, especially
> related to supporting and light-tighting the scintillators and SiPM
> read-out. We will try to arrange a meeting with Youri Sharabian to
> review how some of these issues were solved for the Hall B start
> counter.
>
> New Action Items
>
> 1. Get some details of circuit board design to Chuck. -> Fernando
> 2. Arrange a meeting with Youri to discuss design details. -> Mark
>
> Retrieved from
>
> "https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_22,_2012"
>
>
--
Mark M. Ito
Jefferson Lab (www.jlab.org)
(757)269-5295
More information about the Halld-pid
mailing list