[Halld-pid] Start Counter Meeting Minutes, December 12, 2013
Mark Ito
marki at jlab.org
Sat Dec 14 22:07:44 EST 2013
Flipped over the page in my notebook and discovered I missed a whole
segment of the meeting. Here it is:
Calibration
Sean introduced the effort he has been leading to define the calibration
constants sets that we will need, detector system-by-detector system.
Today was the start counter's turn.
Werner went through the list.
* time walk corrections
* effective speed of light
* parameters for attenuation corrections
* gain constants
* time resolution
* time offsets
He will write down a specific set of constants for us to start with.
On 12/14/2013 09:53 PM, Mark Ito wrote:
> Dear PID list,
>
> Find the minutes below and at
>
> https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_December_12,_2013#Minutes
> .
>
> -- Mark
> ______________________________________________________
>
> GlueX Start Counter Meeting, December 12, 2013
> Minutes
>
> Present:
> * FIU: Werner Boeglin, Eric Pooser
> * JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann
>
> Counter Construction Status
>
> Eric gave the report.
> * Eljen has been having yield problems due to scratches on the bent
> scintillator bars. The Q/A guy there has taken over production and
> since then, yield has improved. They have 25 bars of acceptable
> quality and should have all 50 by Christmas.
> * McNeal has been apprised of the delay. They think that their
> estimate of 4 weeks to do the work should hold.
> * FIU has decided on food grade aluminum to do the wrapping of the
> counters. The thickness is 16.5 µm.
> * Anthony (FIU student) has done several test wraps with good results
> on the barrel and nose sections. The technique on the dreaded bend
> region is the next hurdle.
> * The design of the assembly jig is largely done. The next step is to
> start ordering materials and running the design past the machine
> shop.
> * The exact mechanism for precise clocking of the inner mandrill
> still needs to be worked out.
>
> Support Structure Construction Status
>
> Chuck brought in the latest inner carbon fiber tube for show and tell.
> The length of the tube has been extended from the original plan to 12
> inches. This still will not cover the nose region. We discussed whether
> three layers of carbon fiber was acceptable. Although a bit more
> material will be added than we expected, we thought that we could live
> with it.
>
> [Added in press: Eugene Chudakov points out that we might want to look
> at the effect of the extra material on proton detection efficiency.]
>
> Retrieved from
> "https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_December_12,_2013"
>
--
Mark M. Ito, Jefferson Lab, (757)269-5295
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20131214/70575c35/attachment-0002.html>
More information about the Halld-pid
mailing list