_____________________________
GlueX Start Counter Meeting, June 27, 2013
Minutes
Present:
* FIU: Eric Pooser
* JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann
Construction
Eric described the five new counters from Eljen/McNeal. He has tested
all five. Each measurement took about a day. See [20]his slides for
details. Some of his points:
* The shipping container that the counters arrived in is much more
robust than the one used by McNeal in the past. The container came
originally from Eljen.
* On balance the new counters look much better than any of the
samples we have received before.
* Some of the counters has some light buffing scratches on some
surfaces.
* The counters arrived with different protective light-tack plastic
film than those applied at Eljen. The reason for switching the film
is not known.
* The bars had some visible inhomogeneities or ripples not seen in
straight bars ass Eljen.
* Comparing the laser scattering images from batch 3 (new ones)
versus batch 2, there is much less light escaping the counter,
especially in the bend region.
* Time resolution for each bar was measured. The resolution is much
better than those seen in previous batches, in the range from about
270 to 370 ps, with the worst resolution coming from the bend
region. The improvement at the nose is from about 370 ps with
previous counters to about 300 ps.
* Attenuation lengths were measured, the average of the counters is
39.6 cm.
* Properties of the counters are being kept in a SQLite database.
* Measurements will be repeated every month going forward. Recall
that one of the previous batches showed large deterioration in
performance after about three months. One point on one bar went
from 400 ps resolution to 650 ps due to visible surface crazing.
* Three of the paddles were handled with the wrong type of glove.
These gloves had aloe vera on the surface. They were cleaned with
isopropyl alcohol after this was realized.
Next Steps
We would like to have the readiness review at a point in time near
being ready to assemble finished counters on the support structure.
This will likely be in the early Fall.
We have to pick up the pace on the support structure, the test fixture,
and the assembly fixture. One good thing is that the final drawings of
the detector itself have all been done.
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_June_27,_2013"
References
20.
https://halldweb1.jlab.org/talks/2013-2Q/McNeal_Batch%20_3_ST_Meeting.pdf
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list