[Halld-pid] Start Counter Meeting Minutes, March 7, 2013
Mark M. Ito
marki at jlab.org
Fri Mar 8 08:34:17 EST 2013
Find the minutes below and at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_7,_2013
__
GlueX Start Counter Meeting, March 7, 2013
Minutes
Present:
* FIU: Eric Pooser
* JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann
Announcements
Puneet Khetarpal has gone on to another job. We thank him for his
contribution to the start counter effort at FIU, and congratulate him
on his new position.
SiPM read-out status
Eric got feedback from Fernando Barbosa; he should include the
attenuation in the cables in his estimate for the required gain for the
SiPM readout.
More importantly, he suspects that his previous measurements used a 5X
amplifier and its effect was not taken into account in his
calculations. He will remeasure this afternoon.
Counter Construction
Chuck Hurlbut at Eljen told Eric last week that they are about two days
away from finishing the bending fixture and scintillator would be ready
to ship to McNeal in a week or two.
Eric also reported that he has a new contact at McNeal, Renee, who is
handling the FIU account.
Eric is starting on a design for the test stand for the detector. It
will use complete three-channel SiPM read-out boards.
A final decision on wrapping has not been made. Likely it will be
aluminized mylar around the scintillator. We have to decide on whether
individual counters will be light-tightened with Tedlar or if we rely
on wrapping with an exterior layer only. If significant thickness is
added between counters it should be reflected in the dimensions of the
inner foam support since counter dimensions are fixed at this point.
According to the milestones in the proposal, it looks like the inner
foam support needs to be ready sometime in June.
VME discriminator for FIU
We confirmed that FIU could use a discriminator or two for the the full
detector test. Mark will work on getting them the unit(s).
Light pulsing system or not?
Talking to folks at JLab, Mark reports that folks thing that light
pulsing would be useful, but also that it was a lot of effort and we
should think carefully about whether it is worth that effort at this
stage of the project. We will have to discuss this further. Mark will
check and see if CLAS had any such system for their start counter.
Installation Document
At last week's installation meeting, Curtis showed an installation
document for the CDC, essentially a plan with a timeline. We should
develop a similar document for the start counter: what needs to be done
and when, noting any dependencies on other installation or services in
the Hall.
Contract
Werner told Mark that the technical proposal would go the university
this week for inclusion in the proposal for the construction contract.
Action Items
1. Decide on wrapping scheme.
2. Get discriminator(s) for FIU.
3. Ask about light pulsing for the CLAS start counter.
4. Start thinking about an installation document.
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_7,_2013"
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list