[Halld-pid] Start Counter Meeting Minutes, March 21, 2013
Mark M. Ito
marki at jlab.org
Tue Mar 26 13:24:11 EDT 2013
Find the minutes below and at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_21,_2013#Minutes
__
GlueX Start Counter Meeting, March 21, 2013
Minutes
Present:
* FIU: Werner Boeglin, Eric Pooser
* JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Beni
Zihlmann
Review minutes from previous meeting
We went over the [19]minutes from the March 7th meeting.
Eric reports that he re-did the gain measurement and indeed the ×5
amplifier was there for the previous measurement. He has sent Fernando
detailed information on the new measurement. Essentially the old
results need to be scaled by a factor of 5.
Counter Construction
Eric heard from Chuck Hurlbut of Eljen. They have reported that their
first attempt at bending scintillators for us did not work. The bars
did not hold their intended shape; on cooling they relaxed back
somewhat toward their original flat shape. They are exploring
modifications to their procedures including make a new bending fixture
and trying different temperatures. Eric will check this week with them
on progress.
We should talk to Youri about the procedure that he used. FIU also had
success with their bending procedure in the past. They heated the
entire bar with weights used to hold the shape.
Eric is working on the desing of the asssembly jig. He has an initial
concept that he will discuss with Werner.
Light pulsing system or not?
We discussed the need for a light pulsing system. We reached a
consensus that there would likely not be much advantage to having one
that could not be satisfied with cosmics or simply looking at noise
from the SiPMs. These will tell you if the counters are alive. The
start counter is not an energy measuring device so gain calibration is
not a huge issues. Even if it were it would require a considerable
effort to implement a system that would help with calibration.
We reached a consensus that a light pulser system does not make sense.
We will proceed without one in our plans.
Installation Document
We talked about producing an installation document for planning when
the start counter arrives in the Hall.
On a related issue, we discussed the commissioning target and how it
interfaces with the start counter. Chuck will ask Tim about how far
along plans for that target are.
Contract
Werner discovered that there was a person in the Dean's office at FIU
that was sitting on the proposal. It seems to be moving now. He found
that having a MOU to refer to has helped expedite the process. He
assigned a nominal start date and end date for the project: April 1,
2013 to March 31, 2014.
[Added in press: Werner reports that the proposal now has an official
project number and has started moving through the system.]
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_21,_2013"
References
19.
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_March_7,_2013#Minutes
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list