[Halld-pid] Start Counter Meeting Minutes, May 2, 2013
Mark M. Ito
marki at jlab.org
Sun May 5 19:58:33 EDT 2013
Find the minutes at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_May_2,_2013#Minutes
and below.
_____
GlueX Start Counter Meeting, May 2, 2013
Minutes
Present:
* FIU: Werner Boeglin, Eric Pooser
* JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann
Construction Status
Test Stand
Eric reports that the test stand design is done and is in the hands of
the machinist at FIU. A detailed technical note was written in the
process of specification of the work.
Scintillator
Eric told us that machining has not started and McNeal. There was a
glitch in the procurement process. The contract does call for
completion of the work three weeks APO. The hold-up should be resolved
soon.
SiPM Read-Out
At yesterday's GlueX meeting, Fernando reported that the final SiPM
read-out board design is complete and that a PR is being written for
construction of the boards. He estimated that they might start coming
in sometime in May.
We discussed control of the SiPM bias voltage. There are lines for each
scintillator (a group of four SiPMs) controlled directly and
individually from a stand-alone power supply under EPICS control. The
four SiPMs will have to be matched to accept similar voltages. So each
ST-2 board has three bias voltage lines on it one for each scintillator
serviced.
Assembly Fixture
Eric will turn his attention to this next. He and Chuck agreed to
exchange drawings as that process goes forward.
Contract
The technical proposal evaluation was submitted yesterday. Also terms
and conditions from FIU were received. Legal at JLab has reviewed the
suggested changes and agrees to them. We are now awaiting award.
Installation Document
We agreed to discuss the document at the next meeting.