[Halld-pid] Start Counter Meeting Minutes, February 6, 2014
Mark Ito
marki at jlab.org
Sun Feb 9 12:16:38 EST 2014
Folks,
Find the minutes below and at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_February_6,_2014#Minutes
.
-- Mark
______________________________________________________________________________
GlueX Start Counter Meeting, February 6, 2014
Minutes
Present:
* FIU: Werner Boeglin, Eric Pooser
* JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Tim
Whitlatch, Beni Zihlmann
Construction News
Problem with Scintillator Manufacturer
Eric reported news from McNeal that the 50 pieces of scintillator
received from Eljen were flawed. There are [26]visible bubbles in the
bend region and the edges are not in a single plane, i. e. there is a
[27]skew in the nose relative to the barrel. These pieces are clearly
unacceptable.
McNeal will send them back to Eljen. Eric contacted Chuck Hurlbut of
Eljen; they will investigate the cause. Currently the thinking is that
the bend was overheated (thus the bubbles) and not held in place long
enough during cooling (thus the skew). They are pressing new
scintillator already. Eljen will not charge FIU for this batch. Note
that the previous set of five counters looked very good in all aspects:
visual appearance, shape, and timing resolution.
We estimated that this introduces a two-month delay in the schedule.
June is now the target completion date for construction.
Assembly Jig
The assembly jig is coming together. FIU will start practicing with the
five prototype counters so they will be ready when the production
modules come in.
Support Structure
The new 3-layer carbon fiber inner sleeve complete. The Rohacell foam
should be in any day now. Machining and assembly should take four
weeks.
Eric has seen a situation where in the test stand, the aluminum support
contacted some resistors on the SiPM board if the spacing between the
two is not controlled. Chuck will check on this issue for the full
detector.
Fast Shutdown
Mark raised the question that Hovanes has posed to the groups about
whether there are any special considerations for fast-shutdown systems
that the controls group needs to know about. There seem not to be any
equipment safety issues. Temperatures will be monitored via on-board
thermisters. Those channels have been accounted for in the controls
design. They can presumably initiate a shutdown of the MPOD, likely in
the same way it is done for other SiPM-based read-out systems.
Quality Assurance
In light of the recent troubles with the scintillator, Mark passed on a
reminder from Bruce Lenzer that we be sure to collect documentation
from the manufacturer about pieces passing inspection at their
facilities, at least a certificate of conformance.
TDR
Eric got an email from Mike Dugger about reviewing the start counter
section of the current draft of the TDR. It appears to be quite a bit
out-of-date right now. Eric will do an update and circulate a draft to
the group.
Retrieved from
"https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_February_6,_2014"
References
26. https://halldweb1.jlab.org/talks/2014-1Q/Bubbles.jpg
27. https://halldweb1.jlab.org/talks/2014-1Q/Skewed.jpg
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list