GlueX TOF Meeting, July 3, 2014
Minutes
Present:
* FSU: Sasha Ostrovidov, Aristeidis Tsaris
* JLab: Hussein Al Ghoul, Mark Ito (chair), Sasha Somov
Trigger and Data Acquisition
Sascha S. and Hussein gave us a report.
* The trigger output from each board was checked: flash-to-CTP route
is working.
* Thresholds [?] were checked for all channels.
* All PMTs were set at 1250 V, on the conservative side.
* A pedestal calibration was done on the flashes and the DACs were
set to give a pedestals of 200 counts.
* Pedestals widths are good, about 1.3 counts rms.
* Two trigger methods were tested:
1. instantaneous energy (single-sample ADC count over threshold)
2. integrated energy over an 80 ns window (20 samples)
* There were some initial problems with the CAEN TDCs that had to be
worked through.
* Data was written to disk with both flash and TDC data with the TOF
trigger.
* A stand-alone analyzer was written to create ROOT trees directly
from the EVIO data.
* Sascha showed an event (run tof_106.0, event 1)
* [17]Tof view.png
* Up
* Down
* North
* South
The first figure is a graphical representation showing one counter hit
in the vertical plane and two hit in the horizontal. The next four
figures show the flash data from each channel of each of the four ends
of the detectors (up, down, north, and south). In particular the two
horizontal counters show the expected coincidence in time and
similarity in amplitude.
* The trigger rate was about 200 kHz.
* There is one bad splitter and one bad cable in the system at
present. Chris Stanislav will make the replacement.
Sascha S. will turn will talk to Hussein later today to start turning
over the data acquisition to the FSU team. Aristeidis developed an
independent viewer and had started looking at the data. Paul Eugenio is
working on getting scaler information going, as a monitor on light
leaks among other things.
Now that the DAQ is working at some level there is a huge list of
commissioning issues that can be addressed. We decided to try and have
a meeting on Monday to make a list and assign priorities. Mark will try
to set this up.
BlueJeans Meeting Number
Mark has booked a new meeting in BlueJeans for these bi-weekly
meetings. This is only to give him a bit more direct control of meeting
details. The new meeting ID is 350531998. The [18]BlueJeans meeting
page has been updated.
Additional Plots
[19]Neg1.jpg
[20]Neg2.jpg
[21]Neg3.jpg
[22]Neg3.jpg
References
17. https://halldweb1.jlab.org/wiki/index.php/File:Tof_view.png
18.
https://halldweb1.jlab.org/wiki/index.php/Connect_to_Bluejeans_Meetings
19. https://halldweb1.jlab.org/wiki/index.php/File:Neg1.jpg
20. https://halldweb1.jlab.org/wiki/index.php/File:Neg2.jpg
21. https://halldweb1.jlab.org/wiki/index.php/File:Neg3.jpg
22. https://halldweb1.jlab.org/wiki/index.php/File:Neg3.jpg
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list