[Halld-pid] Start Counter Meeting Minutes, July 24, 2014
Mark M. Ito
marki at jlab.org
Thu Jul 24 14:20:25 EDT 2014
Folks,
Please find the minutes below and at
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_July_24,_2014#Minutes
.
-- Mark
__________________________________________________
GlueX Start Counter Meeting, July 24, 2014
Minutes
Present:
* FIU: Werner Boeglin, Eric Pooser
* JLab: Eugene Chudakov, Mark Ito (chair), Bruce Lenzer, Nick
Sandoval, Tim Whitlatch, Beni Zihlmann
Review of Minutes from July 10th Meeting
We looked at the [21]minutes. Mark needs to check on the status of an
itemized invoice from FIU.
Electronics Trip Report
Nick was at FIU last week, Monday through Thursday to install the start
counter on-detector electronics. Overall the trip went well and all
goals were accomplished.
* ST1/ST2/ST3 boards all delivered.
* MPOD for bias and low voltage was delivered and fired up.
* A cosmic trigger with external counters was set-up and data taking
started.
A couple of minor issues:
* The JLab laptop revoked Nick's admin privileges when it was booted
at FIU. A work-around was found and the control software was
installed on two personal laptops (Nick's and Eric's).
* The ST2 cables to the ST3 were too short to run out of the chicane
of the dark box, so the ST3 enclosure had to be placed inside the
dark box. LEDs on the ST3 were disconnected for obvious reasons.
Detector Construction Status
Eric gave the report.
* Eric wrote a progress report and issued it as a [22]GlueX Note. It
describes the polishing procedure.
* All 50 scintillators tested before polishing and characterized. The
worst of them were used to develop the polishing procedure.
* Polishing procedure finalized.
+ Polish one hour with 0.3 micron alumina suspension.
+ Test timing resolution.
+ Another hour at 0.05 micron if needed.
* Can polish 2-3 a day, total should take 2-3 weeks to finish.
+ There are two polishing stations now.
* 49 of the counters will be polished; one will be kept as-is for
deterioration studies.
* Several bars have been tested multiple times over the past two
weeks; thus far there is no sign of deterioration.
* Camera for adjusting alignment and separation of the scintillator
and SiPMs have been calibrated.
* Shimming will likely have to be done.
* Werner ask about getting 25 micron Kapton from JLab to be used for
shimming material.
* The gap is set by using a spacer of foil and paper to set the
position of the scintillator.
Light Tightening
Werner suggested that we do the final light tightening of the detector
at JLab. All testing at FIU during construction can be done in the dark
box at FIU. Beni pointed out that there is a large dark box in EEL 126
that can be used for testing the scheme here. Mark mentioned that Chuck
had proposed the same idea in a conversation last week.
We decided to pursue this track. There are still several ideas around
for the exact materials and procedure; they need to be finalized in
advance of delivery of the detector to JLab.
Readiness Review Planning
The Review will be held on Monday, August 4, at 10 am. At JLab L207 is
reserved.
The review committee consists of:
* Beni
* Bruce
* Mark
* Nick
* Tim
We looked at the [23]draft charge that Bruce circulated some time ago.
Eric has been looking at that draft to guide his preparations. Bruce
will be making changes to finalize the document.
Eric will lead us through the construction procedures at the review.
[Added in press: it would be nice to get copies of the written
procedures to the committee in advance of the review.]
Bruce had suggested some sort of video tour since there will not be any
committee members on site at FIU. FIU will think about a plan for this;
we thought that perhaps BlueJeans on a mobile device could be used.
Gain Issue
[Added in press: we neglected to discuss the reduction in gain of the
pre-amps after cosmic tests at FIU last week. Reduction by about a
factor of 5 is planned.]
Action Items
1. Look into sending Kapton sheets to FIU for use in shimming. (Tim)
2. Finalize the Review Charge document. (Bruce)
3. Get an advance copy of the procedures of the committee. (Eric)
4. Raise the gain issue at a future meeting. (Mark)
References
21.
https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_July_10,_2014#Minutes
22.
http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2527
23.
https://halldweb1.jlab.org/talks/2014-3Q/FIU%20Start%20Counter%20Manufaturing%20Readiness%20Review%20Scope%20&%20Charge.doc
--
Mark M. Ito, Jefferson Lab, marki at jlab.org, (757)269-5295
More information about the Halld-pid
mailing list