[Halld-pid] [Revised Logentry] Update on TOF status after power outage
ostrov at jlab.org
ostrov at jlab.org
Thu Mar 26 10:00:04 EDT 2015
Logentry Text:
--
After resetting TOF IOC, I was able to turn on TOF HV: first, to 1250 V, and then to the optimal values. All channels came up without any issue. Readout from the discriminator scalers is normal: in the 200-600 Hz range (see attached picture). The status of TOF fADC/TDC readout will be checked when DAQ will be running. I'm now on the way to the Hall to check signals from a few channels with a scope to see if I can improve signal reflections.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3330889
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20150326/3c4b478d/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: tof-scalers-mar26.png
Type: image/png
Size: 356092 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20150326/3c4b478d/attachment-0002.png>
More information about the Halld-pid
mailing list