[Halld-pid] Start Counter Meeting Minutes, August 26, 2016
Mark Ito
marki at jlab.org
Sat Aug 27 17:48:18 EDT 2016
Folks,
Find the minutes below and at
https://halldweb.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_August_26,_2016#Minutes
.
-- Mark
______________________
GlueX Start Counter Meeting, August 26, 2016, Minutes
Present:
* *FIU*: Mahmoud Kamel, Werner Boeglin
* *JLab*: Mark Ito (chair), Paul Mattione, Simon Taylor, Beni Zihlmann
* *NU*: Sean Dobbs
There is a recording of this meeting <https://bluejeans.com/s/s6OQm/> on
the BlueJeans site.
Efficiency Update
Mahmoud presented slides
<https://halldweb.jlab.org/talks/2016/SC_meeting_AUG25_2016.pdf> with
updated efficiency calculations and time resolution measurements. He
used the output of the start counter efficiency plugin, written by Paul,
from the reconstruction launch.
He showed efficiency results for each counter for all tracks, protons,
π^+ , π^− , K^+ , K^− where he used the nominal particle ID provided by
the plugin.
He also showed efficiency for various sections along the length of the
start counter, 25 in all. There are some azimuth variations in the raw
occupancy, but they do not show up in the efficiency calculation except
for the extreme forward sections.
Time resolution was steady for most of the period of the Spring 2016
run, with an average value of 281 ps. There appears to be some slight
reduction, about 25 ps, of the resolution for 1350 A of solenoid current
and 2 ns RF bucket separation. The origin of the effect is not understood.
Run Readiness
* Beni remarked that final readiness checks of the detector cannot be
performed until the FADC firmware has been upgraded.
* Mark will contact Eric Pooser and see if he can help us with
physical check-out in the Hall.
* The hot-checkout procedure is straight-forward, once everything is
installed and powered up.
* Beni mentioned that we will probably want to reduce the time window
for ADC read-out to keep the VME backplane as quiet as possible.
Calibration
Sean encouraged the group to write up the procedure for start counter
calibration in a GlueX Note. Werner agreed, noting that the document
should include step-by-step instructions for performing the calibration
and we should develop the procedure so that those steps are fairly well
automated.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20160827/7122d28d/attachment.html>
More information about the Halld-pid
mailing list