[Halld-pid] Time-of-Flight Meeting Minutes, February 7, 2017

Mark Ito marki at jlab.org
Mon Feb 13 14:28:22 EST 2017


TOF'ers,

Find the minutes below and at 
https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_February_7,_2017#Minutes 
.

   -- Mark
______________________


    Minutes

Present:

  * *FSU*: Sasha Ostrovidov
  * *JLab*: Thomas Britton, Brad Cannon, Mark Ito (chair), Simon Taylor,
    Beni Zihlmann

There is a recording of this meeting <https://bluejeans.com/s/sA3G1/> on 
the BlueJeans site. Use your JLab credentials.


      Lucite Shield Simulation

Thomas has added the Lucite shield to the geometry. He verified its 
presence using using the HDDS-to-ROOT converter, but it appears not to 
be showing up when viewed with hdgeant++. Simon will consult on this. 
Other than this problem, the simulation machinery is ready to go.


      Review of minutes from the previous meeting

We went over the minutes from January 24 
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_January_24,_2017#Minutes>. 


  * The broken FADC was replaced by Sascha Somov.
  * New reference plots for the TOF were added Friday.
  * Mark added a check-box for "Hists OK" on the run-by-run info paper form.


      Run Status

  * *New HV Values*. Beni loaded the new values
    <https://logbooks.jlab.org/entry/3452533>. No voltages are lower
    than 1200 V.
  * *Current draw and scaler rates as a function of beam rate*. We need
    to study this for the new conditions. We are currently running at
    "medium" current, 100 nA, with 30 kHz trigger rate on a ? micron
    diamond.
  * Thresholds on the discriminators can be raised from here, and must
    be for high rate tests, but are acceptable under current conditions.


      Calibration

Beni thought the TOF timing calibrations were OK, but lately discovered 
several channels where the constants do not make sense. However, there 
are some good paddles and they show resolution comparable to that 
obtained in Spring 16 with the higher voltages we had at that time. The 
problem was due to fits failing. A new set of constants has been 
produced and went into the CCDB this morning.


      New Base Design

Beni has tested a prototype from Vladimir Popov. The results look good, 
though there is a signification DC offset at high rate.


      Replacing PMTs

Beni has had discussions with Tim Whitlatch and Tom Carstens on changing 
some of the inner tubes after the run, perhaps as many as 32. They are 
leaning toward a plan where the tubes are replaced in situ (without 
dismounting the entire TOF planes).

-- 
marki at jlab.org, (757)269-5295

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20170213/a142e50b/attachment.html>


More information about the Halld-pid mailing list