[Halld-pid] Time-of-Flight Meeting Minutes, December 5, 2018

Mark Ito marki at jlab.org
Thu Dec 6 18:28:42 EST 2018


Folks,

Please find the minutes below and here 
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_December_5,_2018#Minutes>.

   -- Mark

___________________________


    GlueX TOF Meeting, December 5, 2018, Minutes

Present:

  * *FSU: * Sasha Ostrovidov
  * *JLab: * Thomas Britton, Ashley Ernst, Mark Ito (chair), Simon
    Taylor, Beni Zihlmann

There is a recording of this meeting on the BlueJeans site 
<https://bluejeans.com/s/TEemj/>. Use your JLab credentials to access it.


      Review of minutes from the November 7 meeting

We went over the minutes 
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_November_7,_2018#Minutes>. 
Ashley and Mark fixed her HDGeant4 problem that afternoon.


      Calibration Status

Ashley reported that she had calibrated 216 run from Fall 2018, 
everything up to run 51734. The constants have been entered into CCDB. 
There are only a small number of runs left to do.

She had a question about the proper Zihlmann-authored script to use for 
CCDB entry. She will consult with Beni about the details offline.


      Lucite Shield Geometry

Ashley reported that she has a complete geometry for the shield ready to 
go. For details, see her slides 
<https://halldweb.jlab.org/wiki/images/1/1a/Tof_shielding.pdf>.

  * She met with Paul Eugenio to confirm the number (one) and size
    (large) of the Lucite sheets that were installed. This was confirmed
    with measurements she and Beni performed in the Hall. The dimensions
    have been rendered in the TOF HDDS XML file.
  * She found materials, already in HDDS, suitable for modeling the shield.
  * She succeeded in visualizing the new geometry in HDGeant4.
  * She will consult with Thomas on doing rate studies using MCwrapper.
    The main goal is to reproduce the rate reduction observed in the Hall.
  * After the meeting she and Mark put the new geometry on a branch of
    hdds, namely "tof_shield_ace" and pushed it to GitHub. They also
    built it successfully on ifarm.


      Upgrade Plan

Paul was unable to attend but after the meeting sent slides detailing 
his latest thinking 
<https://halldweb.jlab.org/talks/2018/TOF-Mod-Nov2018.pdf> about the TOF 
upgrade, including two options for geometry changes and corresponding 
cost estimates. Sasha reported that rate studies are underway and he 
sees a reduction of a factor of two in the rate in the highest rate 
counters.

Retrieved from 
"https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_December_5,_2018&oldid=90528"

  * This page was last modified on 6 December 2018, at 18:25.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20181206/9c99424e/attachment.html>


More information about the Halld-pid mailing list