GlueX TOF Meeting, December 5, 2018, Minutes
Present:
* *FSU: * Sasha Ostrovidov
* *JLab: * Thomas Britton, Ashley Ernst, Mark Ito (chair), Simon
Taylor, Beni Zihlmann
There is a recording of this meeting on the BlueJeans site
<https://bluejeans.com/s/TEemj/>. Use your JLab credentials to access it.
Review of minutes from the November 7 meeting
We went over the minutes
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_November_7,_2018#Minutes>.
Ashley and Mark fixed her HDGeant4 problem that afternoon.
Calibration Status
Ashley reported that she had calibrated 216 run from Fall 2018,
everything up to run 51734. The constants have been entered into CCDB.
There are only a small number of runs left to do.
She had a question about the proper Zihlmann-authored script to use for
CCDB entry. She will consult with Beni about the details offline.
Lucite Shield Geometry
Ashley reported that she has a complete geometry for the shield ready to
go. For details, see her slides
<https://halldweb.jlab.org/wiki/images/1/1a/Tof_shielding.pdf>.
* She met with Paul Eugenio to confirm the number (one) and size
(large) of the Lucite sheets that were installed. This was confirmed
with measurements she and Beni performed in the Hall. The dimensions
have been rendered in the TOF HDDS XML file.
* She found materials, already in HDDS, suitable for modeling the shield.
* She succeeded in visualizing the new geometry in HDGeant4.
* She will consult with Thomas on doing rate studies using MCwrapper.
The main goal is to reproduce the rate reduction observed in the Hall.
* After the meeting she and Mark put the new geometry on a branch of
hdds, namely "tof_shield_ace" and pushed it to GitHub. They also
built it successfully on ifarm.
Upgrade Plan
Paul was unable to attend but after the meeting sent slides detailing
his latest thinking
<https://halldweb.jlab.org/talks/2018/TOF-Mod-Nov2018.pdf> about the TOF
upgrade, including two options for geometry changes and corresponding
cost estimates. Sasha reported that rate studies are underway and he
sees a reduction of a factor of two in the rate in the highest rate
counters.
Retrieved from
"https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_December_5,_2018&oldid=90528"
* This page was last modified on 6 December 2018, at 18:25.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20181206/9c99424e/attachment.html>
More information about the Halld-pid
mailing list