Minutes, GlueX TOF Meeting, May 22, 2019
Present:
* *FIU: * Edmundo Barriga
* *FSU: * Jason Barlow, Paul Eugenio, Sasha Ostrovidov
* *JLab: * Thomas Britton, Tolga Erbora, Ashley Ernst, Mark Ito
(chair), Simon Taylor, Tim Whitlatch
There is a recording of this meeting <https://bluejeans.com/s/eXbdh/> on
the BlueJeans site. Use your JLab credentials to access it.
Review of minutes from the last meeting
We went over the minutes from the meeting on May 8
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_May_8,_2019#Minutes>.
Ashley had a look at the geometry. The changes needed for the upgrade
should not be too bad.
Upgrade Status
Procurement
Mark reported:
* The PR for 17 additional phototubes has gone into Procurement. We
should inventory the spares already in hand at JLab.
* Polishing supplies that Paul requested were ordered from MSC. They
should arrive at FSU tomorrow.
Engineering Work
Tim reported:
* Everything in the Hall is ready to go.
* Nothing will be done until the DIRC installation is complete,
probably several more weeks.
* JLab has the drawings in hand for the brackets and will send them
out to be made.
* Collars will made at FSU.
* Paul reports that they have reviewed the drawings Stephanie
Worthington sent and they look good.
* Paul expressed some misgivings at the design of the racks to store
the modules when they arrive at JLab. He and Tim will discuss this
further.
* The gluing fixture will be mounted in the Hall as it was during the
initial installation.
Construction
Paul reported:
* The scintillator bars have arrived at FSU. The boxes will get opened
tomorrow. Inspection routine will be performed.
* Paul will be sending in an order for more RTV and primer.
* The current batch of light guides are ready to have their ends
trimmed off.
* The ESR forming device is getting made.
* Paul has been thinking about the beam support box needed for air
light guides across the beam hole.
* Ashley asked if we would need lucite shielding in the new
configuration. The DIRC will provide some level of shielding but not
over all of the TOF near the beamline. This will require further
thought.
Software
Paul pointed out that there are many software tasks that need to get
done to support the new configuration beyond the geometry specification.
* HV and scaler guis
* Monitoring histograms
* HDvis and hdview2
* TOF reconstruction
* TOF calibration
Retrieved from
"https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_May_22,_2019&oldid=92747"
* This page was last modified on 23 May 2019, at 12:02.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20190523/a57ada22/attachment.html>
More information about the Halld-pid
mailing list