[Halld-pid] Time-of-Flight Meeting Minutes, September 25, 2019
Mark Ito
marki at jlab.org
Wed Sep 25 14:39:48 EDT 2019
Please find the minutes from today's meeting here
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_September_25,_2019#Minutes>
and below.
_______________________________________________
GlueX TOF Meeting, September 25, 2019, Minutes
Present:
* *FSU: * Jason Barlow, Edmundo Barriga, Paul Eugenio
* *JLab: * Mark Ito (chair), Simon Taylor, Tim Whitlatch, Beni Zihlmann
There is a recording of this meeting <https://bluejeans.com/s/7j_E3/> on
the BlueJeans site. Use your JLab credentials to access it.
Review of minutes from the last meeting
We reviewed the minutes of the meeting on August 28
<https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_August_28,_2019#Minutes>.
We have to remember to add the CAEN TDC non-linearity calibration to the
run plan for November.
Upgrade Status
* Tim showed a photo (shown below) of a single PMT on the TOF which is
out of alignment. Paul was not too concerned. Tim can shim things up
so that the steel magnetic shield will fit. Beni will take a look at
the tube with the scope to make sure it looks good from that point
of view.
TOF pmt.jpg <https://halldweb.jlab.org/wiki/index.php/File:TOF_pmt.jpg>
* Paul asked how much torque was applied to the bolts holding the
steel frame against the scintillator counters. Tim discussed this
with the crew before performing the operation; they tightened the
bolts until the between the frame and counters was compressed by 20%.
* Tim reported that Survey and Alignment will be fiducializing the TOF
today. The x-y position will be shot off the frame of the beamline
hole. Roll, pitch, and yaw will be determined from points on the
outer edge of the steel frame.
o Mark mentioned it would be nice to have some kind of measurement
of the increase in the width of the array beyond the sum of the
theoretical scintillator width due to wrapping and geometric
imperfections. Tim assured him this will come as a by-product of
the survey.
* We should add cable labels to the frame as was done for TOF I near
the end of its life.
* TOF will be mounted on the forward carriage on or about a week from
Monday.
* Once the array is mounted, Paul will turn to the design of the
Lucite shield.
NIM Paper
Beni reports that the calibration section of the paper is nearly done.
The main lack at this point the construction section. Paul will turn to
that once TOF II installation settles down.
We will come up with a backup scheme for the Overleaf site.
Retrieved from
"https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_September_25,_2019&oldid=94226"
* This page was last modified on 25 September 2019, at 14:36.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20190925/c5c14f2a/attachment.html>
More information about the Halld-pid
mailing list