Hi Mark et al.,
The long-term performance of SiPMs in GlueX (BCAL, ST, PS) is of
interest both to us and to the general physics community, including EIC.
It might make sense to take a unified approach. In particular, an
important common input to the discussion is the expected total radiation
dose delivered to each of the detectors. To my knowledge simulations of
the radiation have not been done since studies were made to determine
suitability of SiPM sensors during the design stage of the experiment.
This is a non-trivial project and likely will require the use of FLUKA
in addition to GEANT4. It would be good to identify somebody to take on
this task.
Measurements have been done to look at the pedestals for BCAL, but the
SiPMs in the ST are likely to be more affected. I know that Beni is
taking periodic look at the ST (perhaps all sensors?) so it would be
interesting to compare. If I remember correctly, the technology of the
sensors is the same, although the format (array vs single 3x3 units) is
different.
Cheers, Elton
Elton Smith
Jefferson Lab MS 12H3
12000 Jefferson Ave STE 4
Newport News, VA 23606
(757)269-7625
(757)269-6331 fax
On 8/20/20 10:32 AM, Mark Ito wrote:
>
> Folks,
>
> Please find the minutes from today's meeting here
> <https://halldweb.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_August_20,_2020#Minutes>
> and below.
>
> -- Mark
>
>
> GlueX Start Counter Meeting, August 20, 2020, Minutes
>
> Present: Mark Ito (chair), Simon Taylor, Beni Zihlmann
>
> There is a recording of this meeting
> <https://bluejeans.com/s/VWCBLiZ1ljU/> on the BlueJeans site. Use your
> JLab credentials to gain access.
>
>
> Review of minutes from the last meeting
>
> We went over the minutes from July 23
> <https://halldweb.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_July_23,_2020#Minutes>
> without significant comment.
>
>
> Dark Rate Running
>
> Beni reported that he took a SiPM dark rate run (beam off,
> sparsification off) the week before last. His advice is that we do
> this every two weeks.
>
>
> Action Item Review
>
> 1. Document calibration procedure (Rupesh)
> 2. Reproduce Beni's dark current results. (Tolga)
> 3. Revisit Yi's study of SiPM annealing. (Mark, Beni)
> 4. Look up type of SiPMs used in start counter. (Mark)
>
> Retrieved from
> "https://halldweb.jlab.org/wiki/index.php?title=GlueX_Start_Counter_Meeting,_August_20,_2020&oldid=101279"
>
> * This page was last modified on 20 August 2020, at 10:29.
>
>
>
> _______________________________________________
> Halld-pid mailing list
> Halld-pid at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-pid
More information about the Halld-pid
mailing list