Time-of-Flight/Start-Counter Meeting Minutes FIU: Seema Dhamija FSU: Sasha Ostrovidov JLab: Eugene Chudakov, Mark Ito (chair), Elton Smith, Simon Taylor, Tim Whitlatch Review of Last Meeting's Minutes We review the [17]minutes from the August 7 meeting. * Last week Maurizio Bertoldi and Paul Eugenio came up from FSU and visited with Tim. They discussed mechanical support issues for the time-of-flight. * We briefly SiPM trouble seen in Hall B. Elton noted that those problems were after running with an electron beam and they may not be an issue for us. Dose studies should be done in any case. Time-of-Flight Status Sasha O. reported on recent progress. They have continued to work on the problem with one of the Hamamatsu not getting to 100% efficiency. Switching electronics does not change the behavior. If PMT's are swapped the problem moves with the PMT. Paul is trying to get another Hamamatsu H10534. They are also trying to measure the adc spectrum as the trigger counters are moved along the length of the counter. Amplification was suggested; something to try. Start Counter Status Seema gave us an update. The 3 mm thick scintillator is being tested is being tested with an LED pulser (120 ps pulse with 10 ns rise-time). A fine-mesh PMT is being used on one side, a SiPM on the other. The latter is coupled directly to the scintillator. Studies with with cosmics rays will be done with a 2 cm wide trigger counter. Werner has been making plots of of radiation length as function of polar angle for the current geometry. _________________________________________________________________ recorded by [20]Mark Ito Retrieved from "http://www.jlab.org/Hall-D/software/wiki/index.php/Time-of-Flight/Start-Counter_Meeting%2C_August_21%2C_2009" References 17. http://www.jlab.org/Hall-D/software/wiki/index.php/Time-of-Flight/Start-Counter_Meeting%2C_August_7%2C_2009 20. http://www.jlab.org/Hall-D/software/wiki/index.php/User:Marki