    Hi All,<br>
    I would like to address Elton's main concern the lifetime of the
    PMTs.<br>
    <br>
    After 1000 hours of running at 0.1mA the gain reduces by about a
    factor of 2.<br>
    According to my calculations below the highest current PMT is
    0.062mA so <br>
    after about 1400 hours of running the gain would be reduced by about
    a factor<br>
    of 2. The HV is about 1600V for a pristine 10-stage PMT to get a
    gain of 10^6.<br>
    The maximum HV is 2000V for such a PMT with a gain of about 6*10^6.
    So we<br>
    have some headroom to adjust the PMT high voltage to retain a gain
    of 10^6<br>
    for some time, but at least twice such that we can run for about
    3000 hours<br>
    with sufficient gain. That is not perfect but would mean we can run
    for at least<br>
    one year. At the end of one year running (120days full running) one
    would have<br>
    to assess the situation and may consider to replace the 8 PMTs of
    the innermost<br>
    paddles left and right of the beam hole of the two planes. At that
    point we would<br>
    also have enough experience with the TOF to take educated decisions
    on what<br>
    we need as amplifications and operating parameters for the 8-stage
    PMTs in<br>
    the high luminosity running.<br>
    I hope this makes sense to you too.<br>
    <br>
    cheers,<br>
    Beni<br>
    <br>
    <br>
    <br>
    <br>
    <blockquote cite="mid:4EE7B2DA.4010108@jlab.org" type="cite">
      <meta content="text/html; charset=ISO-8859-1"
        http-equiv="Content-Type">
      Hi all,<br>
      <br>
      See my comments attached. Cheers, Elton.<br>
      <pre class="moz-signature" cols="72">Elton Smith
Jefferson Lab MS 12H5
12000 Jefferson Ave
Suite #16
Newport News, VA 23606
(757) 269-7625
(757) 269-6331 fax </pre>
      <br>
      On 12/13/11 11:54 AM, Mark M. Ito wrote:
      <blockquote cite="mid:4EE78333.2000300@jlab.org" type="cite">
        <meta http-equiv="content-type" content="text/html;
          charset=ISO-8859-1">
        Folks,<br>
        <br>
        Yesterday Beni sent out an email summarizing thinking on the
        choice of phototubes for the TOF (see below).<br>
        <br>
        Recall that there is a problem with PMT lifetime for the high
        rate counters near the beamline, especially at 10^8 photons/s.
        The choice of PMT's is central to how we deal with this problem.
        <br>
        <br>
        Please have a look. He is asking for feedback so that we can
        make a decision soon.<br>
        <br>
          -- Mark<br>
        <br>
        -------- Original Message --------
        <table class="moz-email-headers-table" border="0"
          cellpadding="0" cellspacing="0">
          <tbody>
            <tr>
              <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Subject:

              </th>
              <td>[Halld-pid] PMT choice for TOF</td>
            </tr>
            <tr>
              <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Date:
              </th>
              <td>Mon, 12 Dec 2011 12:01:22 -0500</td>
            </tr>
            <tr>
              <th align="RIGHT" nowrap="nowrap" valign="BASELINE">From:
              </th>
              <td>Beni Zihlmann <a moz-do-not-send="true"
                  class="moz-txt-link-rfc2396E"
                  href="mailto:zihlmann@jlab.org"><zihlmann@jlab.org></a></td>
            </tr>
            <tr>
              <th align="RIGHT" nowrap="nowrap" valign="BASELINE">To: </th>
              <td><a moz-do-not-send="true"
                  class="moz-txt-link-abbreviated"
                  href="mailto:halld-pid@jlab.org">halld-pid@jlab.org</a>,
                Elton Smith <a moz-do-not-send="true"
                  class="moz-txt-link-rfc2396E"
                  href="mailto:elton@jlab.org"><elton@jlab.org></a>,
                "Fernando J. Barbosa" <a moz-do-not-send="true"
                  class="moz-txt-link-rfc2396E"
                  href="mailto:barbosa@jlab.org"><barbosa@jlab.org></a></td>
            </tr>
          </tbody>
        </table>
        <br>
        <br>
        <pre>Dear colleagues,
In order to make a final decision on the choice and strategy with regard to
the PMTs for the TOF I put together a few facts and findings and ask for 
your
opinion.
Please read the attached outline set in 4 main paragraphs:
Purpose, Facts, Calculations and Strategies

I am advocating strategy a) where we go with a two phase approach.

Let me know what you think and what makes the most sense. Depending
on your answers we will either take a decision right away or I will call
for a meeting at end of this week (beginning next) so that we can take a
decision on this matter before Christmas.


thanks everybody,
Beni




</pre>
        <br>
        <fieldset class="mimeAttachmentHeader"></fieldset>
        <br>
        <pre wrap="">_______________________________________________
Halld-pid mailing list
<a moz-do-not-send="true" class="moz-txt-link-abbreviated" href="mailto:Halld-pid@jlab.org">Halld-pid@jlab.org</a>
<a moz-do-not-send="true" class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/halld-pid">https://mailman.jlab.org/mailman/listinfo/halld-pid</a></pre>
      </blockquote>
      <pre wrap="">
<fieldset class="mimeAttachmentHeader"></fieldset>
_______________________________________________
Halld-pid mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Halld-pid@jlab.org">Halld-pid@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/halld-pid">https://mailman.jlab.org/mailman/listinfo/halld-pid</a></pre>
    </blockquote>
    <br>
  </body>
</html>