<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    I've been working on implementing the start counter into the
    simulation and to do so I needed a drawing of the region of the beam
    line near the target.  This drawing shows a 6" ID aluminum beam pipe
    within a few centimeters of the upstream end of the start counter.  
    At the end of this beam pipe is a conical section that slopes down
    to the radius of the target vessel.   In fact the start counter
    appears to rest on (or come very close to) part of the beam pipe in
    this region.   Unless I am not understanding some aspect of the
    geometry, it looks like the ST2 board cannot fit in the region
    indicated by the drawing on the last page of Fernando's document as
    drawn.  Furthermore there is only about 2 cm clearance between the
    inner shell of the cdc and the 6" beam pipe.<br>
    <br>
    Simon<br>
    <br>
    <br>
    <br>
    On 05/09/2012 09:45 AM, Mark M. Ito wrote:
    <blockquote cite="mid:4FAA74E6.2090103@jlab.org" type="cite">
      <meta http-equiv="content-type" content="text/html;
        charset=ISO-8859-1">
      from Fernando<br>
      <br>
      -------- Original Message --------
      <table class="moz-email-headers-table" border="0" cellpadding="0"
        cellspacing="0">
        <tbody>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Subject:
            </th>
            <td>ST readout update</td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Date: </th>
            <td>Wed, 09 May 2012 00:53:41 -0400</td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">From: </th>
            <td>Fernando J Barbosa <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:barbosa@jlab.org"><barbosa@jlab.org></a></td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">To: </th>
            <td><a moz-do-not-send="true"
                class="moz-txt-link-abbreviated"
                href="mailto:halld-pid@jlab.org">halld-pid@jlab.org</a>,
              "Mark M. Ito" <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:marki@jlab.org"><marki@jlab.org></a>,
              Werner Boeglin <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:boeglinw@fiu.edu"><boeglinw@fiu.edu></a>,
              Chuck Hutton <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:huttonc@jlab.org"><huttonc@jlab.org></a></td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">CC: </th>
            <td>Fernando J. Barbosa <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:barbosa@jlab.org"><barbosa@jlab.org></a>,
              Elton Smith <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:elton@jlab.org"><elton@jlab.org></a>,
              Eugene Chudakov <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E" href="mailto:gen@jlab.org"><gen@jlab.org></a>,
              Tim Whitlatch <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:whitey@jlab.org"><whitey@jlab.org></a>,
              Fernando J. Barbosa <a moz-do-not-send="true"
                class="moz-txt-link-rfc2396E"
                href="mailto:barbosa@jlab.org"><barbosa@jlab.org></a></td>
          </tr>
        </tbody>
      </table>
      <br>
      <br>
      <pre>Hi all,

I have attached an update on the ST readout. Please review and provide 
feedback.

We have received the first set of SiPMs (50 um) and I plan to send the 
PCBs for fab by the end of this week. I am planning to get two sets 
assembled (50 um) by the end of the month with one set to be shipped to 
Werner. Similar assemblies will be provided for the 100 um units once 
these arrive.

The designs of these PCBs (ST1 and ST2) are intended to be the final 
implementations. The prototype ST3 PCB is only intended for the 
prototype tests and the final version will be installed in a chassis 
which will be located upstream of the target. We will need to determine 
its location soon.

Chuck, I need to know the length of cable (micro-coax ribbon cable 
assembly) needed to connect the ST2 to the chassis so we can order it 
for the tests.

Best regards,
Fernando

</pre>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Halld-pid mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Halld-pid@jlab.org">Halld-pid@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/halld-pid">https://mailman.jlab.org/mailman/listinfo/halld-pid</a></pre>
    </blockquote>
    <br>
  </body>
</html>