<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p>Folks,</p>
    <p>Please find the minutes below and at</p>
    <p> 
<a class="moz-txt-link-freetext" href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_June_6,_2018#Minutes">https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_June_6,_2018#Minutes</a></p>
    <p>  -- Mark</p>
    <p>______________</p>
    <p>
    </p>
    <div id="globalWrapper">
      <div id="column-content">
        <div id="content" class="mw-body" role="main">
          <h2 id="firstHeading" class="firstHeading" lang="en"><span
              dir="auto">GlueX TOF Meeting, June 6, 2018, </span><span
              class="mw-headline" id="Minutes">Minutes</span></h2>
          <div id="bodyContent" class="mw-body-content">
            <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
              lang="en">
              <p>Present:
              </p>
              <ul>
                <li> <b> FSU: </b> Sasha Ostrovidov</li>
                <li> <b> JLab: </b> Mark Ito (chair), Simon Taylor,
                  Beni Zihlmann</li>
              </ul>
              <p>There is a <a rel="nofollow" class="external text"
                  href="https://bluejeans.com/s/Gar0v/">recording of
                  this meeting</a> on the BlueJeans site. Use your JLab
                credentials.
              </p>
              <h3><span class="mw-headline"
                  id="Review_of_Minutes_from_the_May_23_Meeting">Review
                  of Minutes from the May 23 Meeting</span></h3>
              <p>We reviewed the <a
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_May_23,_2018#Minutes"
                  title="GlueX TOF Meeting, May 23, 2018">minutes</a>
                without comment.
              </p>
              <h3><span class="mw-headline" id="Calibration_Status">Calibration
                  Status</span></h3>
              <p>Beni gave the report. Calibration is complete. All runs
                for which Sean Dobbs produced files are done. The
                constants obtained have not been written to the CCDB
                yet.
              </p>
              <h4><span class="mw-headline"
                  id="Checking_stability_of_the_timing_constants">Checking
                  stability of the timing constants</span></h4>
              <ul>
                <li> The downstream plans appears less stable than the
                  upstream.</li>
                <li> For some PMTs, isolated runs show large excursions.
                  These are likely due to failures in the calibration
                  program for these channels. These only appear in the
                  downstream plane and not the upstream, against naive
                  expectations.</li>
                <li> We may have to revisit calibrations for selected
                  channels.</li>
              </ul>
              <h4><span class="mw-headline"
                  id="Variations_in_the_signal_amplitude">Variations in
                  the signal amplitude</span></h4>
              <p>Beni showed plots of signal amplitude versus run number
                for two of the PMTs.
              </p>
              <p><a
                  href="https://halldweb.jlab.org/wiki/index.php/File:Pmt19_amplitude.gif"
                  class="image"><img alt="Pmt19 amplitude.gif"
                    src="https://halldweb.jlab.org/wiki/images/c/c3/Pmt19_amplitude.gif"
                    width="567" height="387"></a>
              </p>
              <p>PMT 19 is in near the beam line in the downstream
                plane. Note that the gain seems to have dropped 12-15%
                over the course of the run.
              </p>
              <p><a
href="https://halldweb.jlab.org/wiki/index.php/File:Adc_mpv_pmt110_new1.gif"
                  class="image"><img alt="Adc mpv pmt110 new1.gif"
                    src="https://halldweb.jlab.org/wiki/images/3/36/Adc_mpv_pmt110_new1.gif"
                    width="569" height="385"></a>
              </p>
              <p>PMT 110 is also near the beam line in the upstream
                plane. Note the rise in gain around run 41900. Beni sees
                extra noise in the HV voltage read-back around this
                time, but the cause of the rise is still under
                investigation.
              </p>
              <h3><span class="mw-headline" id="TOF_Upgrade">TOF Upgrade</span></h3>
              <p>Sasha reported that Paul Eugenio has the FSU shop
                working on a mock up the the central region of a newly
                configured TOF. In particular they are trying ideas for
                how the light guides for the half-width paddles should
                be shaped.
              </p>
              <p>Also, in July, Paul is planning on coming up to the
                Lab. He wants to paint the ends of half-length paddles
                black so that there is little contribution from light
                reflected from the beam-adjacent face of the counters.</p>
            </div>
          </div>
        </div>
      </div>
    </div>
    <pre class="moz-signature" cols="72">-- 
Mark Ito, <a class="moz-txt-link-abbreviated" href="mailto:marki@jlab.org">marki@jlab.org</a>, (757)269-5295
</pre>
  </body>
</html>