<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p>Folks,</p>
    <p>Please find the minutes <a moz-do-not-send="true"
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_May_8,_2019#Minutes">here</a>
      and below.</p>
    <p>  -- Mark</p>
    <p>_________________________________________________________</p>
    <p>
    </p>
    <div id="globalWrapper">
      <div id="column-content">
        <div id="content" class="mw-body" role="main">
          <h2 id="firstHeading" class="firstHeading" lang="en"><span
              dir="auto">Minutes, GlueX TOF Meeting, May 8, 2019</span></h2>
          <div id="bodyContent" class="mw-body-content">
            <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
              lang="en">
              <p>Present:
              </p>
              <ul>
                <li> <b> FSU: </b> Paul Eugenio, Sasha Ostrovidov</li>
                <li> <b> JLab: </b> Thomas Britton, Ashley Ernst, Mark
                  Ito (chair), Simon Taylor, Tim Whitlatch, Beni
                  Zihlmann</li>
              </ul>
              <p>There is a <a rel="nofollow" class="external text"
                  href="https://bluejeans.com/s/K8rxT/">recording of
                  this meeting</a> on the BlueJeans site. Use your JLab
                credentials to access it.
              </p>
              <h3><span class="mw-headline"
                  id="Review_of_minutes_from_the_last_meeting">Review of
                  minutes from the last meeting</span></h3>
              <p>We looked at <a
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_April_24,_2019#Minutes"
                  title="GlueX TOF Meeting, April 24, 2019">the minutes
                  from the meeting on April 24</a>. Mark did end up
                buying the mill bit and the scintillator modules as per
                Paul's specs.
              </p>
              <h3><span class="mw-headline" id="Upgrade_Reports">Upgrade
                  Reports</span></h3>
              <ul>
                <li> Paul reported that the scintillator order was
                  received by Eljen. Delivery to FSU is expected May 31.</li>
                <li> More light guide material will be needed. There is
                  another run planned at the factory this month. Paul is
                  reluctant to try a different manufacturer since the
                  material from this one has been problem-free.</li>
                <li> Beni has had a second look at the electronics
                  situation. We seem to be OK. Fernando Barbosa is aware
                  of what we will need.</li>
                <li> Tim reported that the technical staff is all ready
                  to go on the job of unmounting the TOF and laying it
                  horizontal in the Hall. Work can start as soon as the
                  current tasks on the DIRC have been completed.</li>
                <li> Paul will send photos of the arrays during the
                  initial installation. He would like it if the
                  orientation could be the same as it was last time.</li>
              </ul>
              <h3><span class="mw-headline" id="Air_Light_Guides">Air
                  Light Guides</span></h3>
              <p>Sasha has been testing joining the half-length counters
                optically across the beam hole region with an air
                channel; essentially extending the ESR/Tedlar wrapping
                across the gap. He has been using the half-length
                counters from the mini-TOF at FSU. Looking at scaled
                coincidence rates of cosmics using an end-to-end
                coincidence of a full-length counter as trigger, he sees
                the following probabilities of seeing a signal in one
                half-length counter when the other one fires:
              </p>
              <table border="border">
                <tbody>
                  <tr>
                    <th> HV (V) </th>
                    <th> Hit Probability (%)
                    </th>
                  </tr>
                  <tr>
                    <td> 1200 </td>
                    <td> 3
                    </td>
                  </tr>
                  <tr>
                    <td> 1300 </td>
                    <td> 18
                    </td>
                  </tr>
                  <tr>
                    <td> 1400 </td>
                    <td> 60
                    </td>
                  </tr>
                </tbody>
              </table>
              <p>However if an additional scintillator is added to the
                coincidence to insure a cosmic hit near the air light
                guide (within 6 cm), the other-counter-hit-probability
                increases to 90% at 1400 V.
              </p>
              <p>Sasha is repeating the study with a full data
                acquisition system.
              </p>
              <p>Beni suggested some stiffening material for the walls
                of the light guide (low mass, e. g., cardboard).
              </p>
              <p>There was some discussion of support for the ends of
                the counters around the beam hole. This would be
                complicated by the presence of air light guides.
              </p>
              <h3><span class="mw-headline" id="Geometry">Geometry</span></h3>
              <p>Ashley pointed out that we will need to modify the
                geometry of the TOF for the upgraded configuration. She
                will look into how much work is involved in that.
              </p>
              <h3><span class="mw-headline" id="Collaboration_Meeting">Collaboration
                  Meeting</span></h3>
              <p>Paul will give a report at next week's collaboration
                meeting on the status of the upgrade.
              </p>
              <h3><span class="mw-headline" id="Calibration">Calibration</span></h3>
              <p>Beni has started calibrating the Spring 2019 data.
                Results are hard to check because of the absence of
                tracking. Simon pointed out that the FDC was on for a
                few runs; perhaps those runs can be examined.
              </p>
            </div>
            <div class="printfooter">
              Retrieved from "<a dir="ltr"
href="https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_May_8,_2019&oldid=92559">https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_May_8,_2019&oldid=92559</a>"</div>
          </div>
        </div>
      </div>
      <div id="footer" role="contentinfo">
        <ul id="f-list">
          <li id="lastmod"> This page was last modified on 8 May 2019,
            at 13:47.</li>
        </ul>
      </div>
    </div>
  </body>
</html>