<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p>Folks,</p>
    <p>Please find the minutes <a moz-do-not-send="true"
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_July_31,_2019#Minutes">here</a>
      and below.</p>
    <p>  -- Mark</p>
    <p>_____________________________________________</p>
    <p>
    </p>
    <div id="globalWrapper">
      <div id="column-content">
        <div id="content" class="mw-body" role="main">
          <h2 id="firstHeading" class="firstHeading" lang="en"><span
              dir="auto">GlueX TOF Meeting, July 31, 2019, </span><span
              class="mw-headline" id="Minutes">Minutes</span></h2>
          <div id="bodyContent" class="mw-body-content">
            <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
              lang="en">
              <p>Present:
              </p>
              <ul>
                <li> <b> FSU: </b> Edmundo Barriga, Ashley Ernst, Paul
                  Eugenio, Sasha Ostrovidov</li>
                <li> <b> JLab: </b> Mark Ito (chair), Tim Whitlatch</li>
              </ul>
              <p>There is a <a rel="nofollow" class="external text"
                  href="https://bluejeans.com/s/jjmiz">recording of this
                  meeting</a> on the BlueJeans site. Use your JLab
                credentials to access it.
              </p>
              <h3><span class="mw-headline"
                  id="Review_of_minutes_from_the_last_meeting">Review of
                  minutes from the last meeting</span></h3>
              <p>We went over the <a
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_July_17,_2019#Minutes"
                  title="GlueX TOF Meeting, July 17, 2019">minutes from
                  the meeting on July 17</a>. Mark got the shipping
                authorization and the modified loan agreement in place
                so that Paul could take the PMTs down to FSU.
              </p>
              <h3><span class="mw-headline" id="Upgrade_Status">Upgrade
                  Status</span></h3>
              <p>Paul was at JLab last week and worked with engineering
                and technical staff in the Hall. The week's activities
                went well:
              </p>
              <ul>
                <li> The TOF was un-mounted and dis-assembled. See the
                  photo above.</li>
                <li> Modules were inspected for damage. All light guides
                  and phototubes were intact. There were only minor
                  tears in the Tedlar wrapping in a few locations.</li>
                <li> Nearly all the vertically-oriented modules showed a
                  significant shift (up to an inch) in the downward
                  direction relative to the iron shields and thus
                  relative to the frame. The bottom tubes were sticking
                  out, the top tubes were recessed in their shields.
                  <ul>
                    <li> Nylon bolts will be threaded through new tapped
                      holes in the bottom row of shields to provide a
                      physical stop against motion of the tubes in their
                      shields.</li>
                  </ul>
                </li>
                <li> The rubber strips that are compressed the between
                  the steel frame and the scintillator needs to be
                  replaced.</li>
                <li> Also, the soft foam padding that supports the light
                  guides in their channel will be replaced. Paul will
                  send Tim his records of the material we used last
                  time.</li>
                <li> All modules will need to be tested. Edmundo and
                  Jason Barlow (students from FSU) will arrive next week
                  to perform the tests. JLab folks need to help get them
                  set up with a scope and HV supply as well as room to
                  work in the Hall.</li>
                <li> There are some new holes that need to be drilled in
                  the frame for the new positions of the inner modules.
                  The frame will be completely disassembled to drill
                  those holes. Records of relative orientation and
                  location of any shimming will be made first.</li>
                <li> The new modules will be shipped directly to the
                  Hall, not staged in ESB as they were last time.</li>
                <li> Paul will check progress of the machine shop on the
                  remaining collars.</li>
                <li> All of the short modules have been tested at FSU.</li>
                <li> There were a few modules where the light guide ends
                  were buffed after polishing, potential compromising
                  the strength of the glue joint. Paul has been
                  mechanically stressing the joints to make sure no weak
                  ones make it through.</li>
                <li> Tim had asked Stephanie Worthington to produce
                  drawings of the acrylic beam hole support box from the
                  3-D model and send them to Paul.</li>
                <li> Mark asked Paul to send him the serial numbers of
                  the tubes that were mounted on scintillators Y-22,
                  Y-23, Y-24, and Y-25 (short modules, oriented
                  horizontally) to confirm their locatio in the (legacy)
                  channel map he is putting together.</li>
              </ul>
              <h3><span class="mw-headline" id="Software_Issues">Software
                  Issues</span></h3>
              <p>Ashley reported that the reconstruction software has
                been changed by Sean to reflect the upgrade based on the
                geometry prepared by Ashley. They are in the process of
                testing and hope to produce monitoring histograms from
                simulated bggen data.
              </p>
            </div>
            <div class="printfooter">
              Retrieved from "<a dir="ltr"
href="https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_July_31,_2019&oldid=93426">https://halldweb.jlab.org/wiki/index.php?title=GlueX_TOF_Meeting,_July_31,_2019&oldid=93426</a>"</div>
          </div>
        </div>
      </div>
      <div id="footer" role="contentinfo">
        <ul id="f-list">
          <li id="lastmod"> This page was last modified on 31 July 2019,
            at 16:46.</li>
        </ul>
      </div>
    </div>
  </body>
</html>